EN

About me

I am Mariame Jane Morales, the architect behind Morales Arch & Design. I care about drawings that are accurate, complete and easy to build from.

I studied architecture at Cebu Institute of Technology University and spent my first professional years at a design studio in Cebu, working on residential, retail, commercial and interior projects. There I produced shop drawings for casework, millwork and metal facade systems, translated design intent into construction-ready drawings, and learned how much a missing dimension costs on site.

Since February 2026 I work as a freelance architect. I take projects from the schematic design to the construction drawings, check them against the brief and the code requirements, and work with clients remotely, answering technical questions as they come up.

LinkedIn profile

Mariame Jane Morales
Mariame Jane Morales

Credentials

  • Licensed ArchitectPhilippines
  • Registered Master PlumberPhilippines
  • Bachelor of Science in ArchitectureCebu Institute of Technology University, 2018 to 2023

Software

AutoCAD for 2D drawings and details, SketchUp for 3D models, Lumion for renders, Bluebeam Revu and Adobe Acrobat for mark-ups, Adobe Creative Suite and Microsoft Office.

How I work

  • Remotely, with clients in any country: briefs, files and revisions travel online.
  • One person responsible for the drawings from the first layout to the last detail.
  • Organised, version-controlled drawing files, so every revision is traceable.
  • Plain answers to technical questions from you and your contractor.

Experience

  1. February 2026 to presentFreelance architect

    Floor plans, elevations, sections and details in AutoCAD; projects managed end to end from schematic design to construction drawings; building efficiency calculations; remote work with clients.

  2. May 2023 to June 2025Architectural intern, project in charge, design studio in Cebu

    Shop drawings for casework, millwork and metal facades; construction drawings for residential, retail, commercial and interior projects; RFI responses and redlines; area and quantity calculations, site measurements and take-offs; 3D models and renders in SketchUp and Lumion.

Good to know

My licences are issued in the Philippines. For a building permit in another country, the drawings I prepare are reviewed, signed and submitted by a locally licensed architect or engineer. Structural, electrical and mechanical design belongs to the relevant engineers; I coordinate my drawings with theirs.

The mark

The Morales Arch & Design monogram is the letter M drawn as a single thin line: two outer strokes like the frame of a structural bay, a central peak that reads as a gable, a ridge beam and a ground line beneath. Thin, even lines, as on a drawing sheet.

Planning a build, a renovation or a new interior?

Send a floor plan, photos or a short description. We will reply with what drawings you need and how the work can be organised remotely.

Discuss your project