Office Fit Out and Design: From Empty Floor to Working Office
Office fit out and design is the work of turning an empty or outdated floor into a space where people can sit, meet, focus and move without friction. Design is the plan, fit out is the build, and the decisions about layout, services and safety made early on shape cost, timeline and how well the office works for years.
- Topic
- Fit-out
- Updated
- Reading time
- 14 min
- Studio
- Morales Arch & Design

In this article
- What office fit out and design means
- Shell and core, Cat A, Cat A+ and Cat B fit out
- Choosing between Cat A+ and Cat B, and what the lease says
- The office fit out process step by step
- Office design and fit out ideas for productivity and comfort
- How much an office fit out costs in 2026
- Design and build or traditional route: choosing who does the work
- Office fit out and design FAQ
What office fit out and design means
A fit out turns an empty shell into a usable office. It decides how people sit, move, talk and work every day, not only how the reception looks to visitors. Most of the decisions that shape that daily experience, such as layout, building services and safety, are made long before the first desk arrives.
Office design and fit out are often used as one phrase, yet they are two different stages. Design is the plan: the brief, the layout, the materials and the look. Fit out is the build that puts the plan into the space: floors, ceilings, partitions, wiring and furniture. A fit out usually starts from a new or empty space, which is why it is typical for newly leased premises.

Refurbishment is the third term that gets mixed in. It improves an office that is already working: new paint, new furniture or a reconfigured layout for a space that has become outdated. A strip-out and refurbishment goes further, removing old interiors and fixtures before repairing or re-planning the floor, and is used when a business modernises or its team grows. If you are still at the stage of deciding how the floor should work, our guide to office layout design covers planning the floor plate itself.
Shell and core, Cat A, Cat A+ and Cat B fit out
Office fit outs are grouped by how far the space has been taken. The terms come from UK practice. In the US the same stages tend to go by other names, so ask the landlord or broker exactly what is delivered rather than relying on the label.
Shell and core
The building is complete but the floors are bare. The core holds lifts, stairs and risers; the shell is the frame, floor slabs, roof, external walls and windows. Sprinklers, toilets on each floor and the main plant are usually in place. There are no internal walls, ceilings, lights, wiring, HVAC distribution or furniture. The developer or landlord normally delivers shell and core so that tenants can shape the layout themselves and do not pay to rip out someone else's guess.
Cat A
Cat A is the landlord's base finish: raised floor, suspended ceilings, standard lighting, HVAC, mechanical and electrical services run to the floor, and fire detection. There are no rooms, no kitchen and no furniture. In UK buildings the raised floor panels are typically 60 x 60 cm with a 10-25 cm void for power and data. Cat A suits tenants who want quick possession but still want control over seating and circulation.
Two cautions. Cat A is not the same as Grade A, which describes the quality of the building. And Cat A quality varies: ceiling height, floor loading, power and cooling capacity all limit what the next stage can achieve.
Cat A+
Also called plug and play. It is Cat A plus generic meeting rooms, a tea point, floor finishes, IT infrastructure and often furniture. Landlords started offering it to compete with serviced and co-working offices, and a Cat A+ floor can be occupied in about 4-8 weeks. The upfront bill is smaller, but the landlord recovers the spend through the rent, so the total over 5-10 years can end up similar. Room positions, finishes and kitchen size are the landlord's choice, and what each offer includes differs, so check it line by line.
Cat B
Cat B is the tenant's own fit out on top of Cat A: partitions, brand finishes, bespoke joinery for reception, tea points and storage, feature and task lighting, AV and IT cabling, kitchens, breakout areas, furniture and signage. This is where branding, colours, artwork and the way the business actually works get built in, whether that means open plan for collaboration or a mix of private offices and meeting rooms.
| Stage | What you get | Usually delivered by | Time to move in (UK) |
|---|---|---|---|
| Shell and core | Structure, core, facade, main plant, toilets, sprinklers | Developer or landlord | Not occupiable |
| Cat A | Raised floor, ceilings, standard lighting, HVAC, fire detection | Landlord | Needs Cat B or A+ first |
| Cat A+ | Cat A plus generic rooms, tea point, finishes, IT, often furniture | Landlord | About 4-8 weeks |
| Cat B | Tenant layout, joinery, AV/IT, kitchens, branding, furniture | Tenant | 16-24 weeks from Cat A |
Choosing between Cat A+ and Cat B, and what the lease says
Cat B makes sense when generic space will not do the job. A trading floor needs extra power and cooling, a law firm needs acoustic privacy, a creative agency needs open, flexible floors. A lease of 10-15 years also helps, because the cost is spread over a long period.
Cat A+ is the better value when speed or cash matters most, or when you are not sure how much space you will need in a few years. Walking away at the end of the lease is cheaper too.
Reinstatement is where many tenants get caught out. A lease may require you to return the floor to Cat A when you leave, and that cost, known in the UK as dilapidations, should be planned from day one. A bespoke Cat B fit out usually has to be stripped out at lease end, while landlord-funded Cat A+ works may be allowed to stay. Agree the reinstatement terms in the lease before you move in.
Before signing a lease, have a fit-out specialist visit the building. A site visit picks up problems with power distribution, HVAC and ventilation, gives you leverage to negotiate with the landlord, and lets you confirm that ventilation is compliant before you are committed.
The office fit out process step by step
Most fit outs run through the same sequence, whichever category you start from.
- Requirements. A site visit, a review of existing services and full measurements of the space.
- Layout planning. Function comes before looks: headcount, team adjacencies, meeting rooms, focus space and circulation.
- Design. The layout is developed into a full design with materials, finishes and lighting selected. Detailed fit out drawings come out of this stage.
- Approvals. Permissions from the landlord and the local authority are secured before construction, so work is not held up halfway.
- Construction. Structural work where needed, partitions and mechanical, electrical and plumbing works, followed by finishes.
- Quality check and handover. Snagging, testing of services, then the keys.
How long an office fit out takes
UK figures give a useful benchmark. A typical 10,000 sq ft fit out takes around 10-12 weeks on site in 2026, and that can be shortened or stretched. Going from Cat A to a finished Cat B takes 16-24 weeks of design and construction, plus lead times for furniture and specialist equipment. A shorter programme costs more because it needs out-of-hours and weekend work. In the US, local permitting often sets the pace, so build approval time into the schedule.
Delays rarely come from the build itself. They come from assumptions: late approvals, unclear scope and vendors who are not working to the same plan.
Office design and fit out ideas for productivity and comfort
A good fit out pays for itself through the way people work. Ergonomic furniture, natural light, quiet zones and a layout that cuts wasted walking all add to productivity. Sit-stand desks, task lighting and acoustic panelling are now standard expectations in offices rather than extras.
Key components to get right
- Partitions. Drywall, timber or modular systems. They are non-permanent and modular ones can be reused when the layout changes.
- Ceilings. False or open ceilings change how high the room feels and carry lighting, acoustics and services.
- Flooring. Vinyl, stone and laminate are common; the choice affects safety and comfort underfoot.
- HVAC and ventilation. Stable temperature and fresh air keep people focused. In hot climates, cooling capacity is essential.
- Lighting. Plan it in two layers, ambient and task, and avoid both harsh glare and dim corners. Use natural light first, LED for the rest.
- Technology. Cable management, smart meeting rooms and fast internet planned into the floor and ceiling, not added later.
Layout and atmosphere
Mix open areas for teamwork with private rooms for focus and enough meeting rooms. Ergonomic chairs, adjustable desks and correct desk heights matter more than the brand of the furniture. Built-in cabinets, wall shelving and hidden storage keep surfaces clear. Breakout spaces such as lounges, coffee corners and quiet relaxation areas give people somewhere to reset, and plants together with good air circulation improve the air.
For wellbeing, biophilic design, breakout areas and adjustable lighting work well together. Neutral tones, minimal decoration and clean layouts are easier to maintain. Company colours, logo placement and a consistent design theme bring the brand into the space without overdoing it. To future-proof the office for growth and shifts in hybrid working, keep the layout flexible and use modular furniture. A Cat B fit out from Cat A also gives the most room for sustainability, through material choices, energy systems and certifications such as BREEAM. More layout and styling ideas are collected in our article on office design.
How much an office fit out costs in 2026
Price depends on whether the change is cosmetic or structural, the amount of AV and ICT, the furniture, the timeline, the size of the space and the procurement route. Estimates also assume the power distribution and HVAC are in good working order, which is often not the case in older buildings. Other drivers are the age and specification of mechanical and electrical services, whether there is a raised floor, a listed or historic building with extra paperwork, and the overall specification level.
US and Canada
Based on Q1 2026 pricing, a medium-quality corporate fit-out in the US and Canada averages about USD 295 per sq ft, with a typical range of USD 230-375.
| Layout type (US/Canada, 2026) | Baseline | Medium | High | Full market range |
|---|---|---|---|---|
| Open and agile | $255 | $275 | $310 | $170-380 |
| Varied spaces (mixed) | $275 | $295 | $340 | $180-405 |
| Structured (more enclosed rooms) | $285 | $310 | $355 | $190-425 |
All figures are per sq ft. Security, IT and AV make up roughly 10-12% of fit-out cost in 2026, with a median rise of 8% year on year, and MEP and technology are the fastest-rising parts of the budget. Specialty trade wages are going up and material and trade-policy costs are not yet fully reflected in bids, so a budget drawn up before 2026 should be re-benchmarked. Sun Belt markets come in cheaper, coastal gateway cities higher, and Canada sits at its own level.

United Kingdom
London prices for 2026 depend on what is counted. All-in prices without dilapidations run from about GBP 90 per sq ft at the low end (construction 65, AV 5, furniture 20), through GBP 135 mid-range, to GBP 190 and more for high spec (construction 120+, AV 15+, furniture 55+). A breakdown that includes dilapidations looks like this:
| GBP per sq ft (UK, 2026) | Low | Mid | High |
|---|---|---|---|
| Construction | 70 | 90 | 120 |
| Furniture | 20 | 35 | 60 |
| AV and IT | 5 | 10 | 15 |
| Dilapidations | 15 | 18 | 20 |
| Security | 1 | 2 | 3 |
| Total | 111 | 155 | 218 |
Dilapidations of GBP 15-20 per sq ft are not part of the fit out itself, but they belong in the total budget. For small offices a per-person view helps: mid-spec furniture alone runs about GBP 800-900 per person. As an example, a 2,000 sq ft office for 20 staff fitted out from Cat A comes to roughly GBP 180,000. Above 10,000 sq ft, an estimate built from the actual specification is the most accurate.
Furniture, fixtures and equipment (FF&E) is a large share of spend. Procure it in parallel with the design so the plan and the deliveries match, and if you are taking a Cat A+ floor, check whether furniture is already included. Whatever the figure, set a clear budget, avoid spend that does not serve the brief and keep a reserve. A building cost estimator can help you sanity-check early numbers.
Design and build or traditional route: choosing who does the work
There are two main ways to buy an office fit out. In the traditional route you appoint the architect or designer, the contractor and the suppliers separately. A large refurbishment done this way can involve designers, builders, space planners, furniture suppliers and possibly a surveyor, a structural engineer and a project manager.
In design and build, one firm takes the project from design through construction. It has become the more popular route because it saves time and closes the gaps between consultants. In the UK, up to 85% of interior fit outs under GBP 1,000,000 are procured as design and build. A turnkey contract goes furthest: one company handles concept, approvals, furniture and problem solving all the way to handover.
Common mistakes to avoid
- Signing the lease before a fit-out specialist has inspected the building and its services.
- Not confirming ventilation compliance before committing to the space.
- Assuming the existing power and HVAC are in good order without checking.
- Starting construction before approvals are in place.
- Leaving the scope vague, so vendors work to different assumptions.
- Ordering furniture late, after the layout is fixed, and waiting weeks for delivery.
- Ignoring reinstatement and dilapidations in the lease and the budget.
Where structural changes, building services or approvals are involved, local rules may require licensed professionals to design and sign off parts of the work. If you need someone to lead the design side, see what a commercial interior designer typically handles.
Office fit out and design FAQ
What is the main goal of an office fit out?
To turn an empty or outdated space into an office that supports how people actually work: where they sit, how they move, where they meet and where they can focus, with services and safety built in.
How much does an office fit out cost per sq ft?
In the US and Canada a medium-quality corporate fit-out averaged about USD 295 per sq ft in 2026, typically USD 230-375. In London 2026 ranges run from about GBP 90 to GBP 190+ per sq ft without dilapidations, or GBP 111 to 218 with them.
What is the difference between Cat A and Cat B?
Cat A is the landlord's base finish with raised floors, ceilings, lighting, HVAC and fire detection but no rooms or furniture. Cat B is the tenant's own fit out on top: partitions, kitchens, joinery, AV and IT, branding and furniture.
What is the difference between a fit out and a refurbishment?
A fit out starts from a new or empty space, usually a newly leased one. A refurbishment improves an office that is already in use with new paint, furniture or a reconfigured layout.
How long does an office fit out take?
In the UK a typical 10,000 sq ft fit out takes about 10-12 weeks on site, and a full Cat A to Cat B project 16-24 weeks of design and construction plus furniture lead times. A Cat A+ floor can be occupied in about 4-8 weeks.
How can a fit out improve productivity?
Ergonomic furniture, natural light, quiet zones, good ventilation and a layout that cuts wasted time make the biggest difference, along with breakout areas and reliable technology in meeting rooms.
Office layout design: layout types, space per person and clearances
Fit Out Drawings and What a Complete Set Includes
Office Design: How to Plan Space, Layout, Lighting and Furniture