Plumbing Drawings for Permit: What Goes in the Set and How to File It

Plumbing drawings for a permit are a scaled set that normally includes a cover sheet, plumbing floor plans, riser diagrams, fixture and equipment schedules and details, plus a site plan when pipe runs outside the building. Pipe and trap sizes have to appear on both plans and risers, and an alteration has to show existing and new work separately. Who may sign depends on the jurisdiction; in New York City only a state-licensed professional engineer or registered architect can file.

Topic
Plumbing design
Updated
Reading time
13 min
Studio
Morales Arch & Design
Open bathroom wall with PEX and PVC rough-in and rolled plans on a sawhorse
In this article
  1. What permit plumbing drawings are and who signs them
  2. What the permit set must contain
  3. Drawing the plumbing floor plan
  4. Riser diagrams
  5. Isometric drawings, slope and vents
  6. Fixture schedules and pipe sizes
  7. Symbols, line types and lettering
  8. Permit drawings for existing buildings and remodels
  9. Submission, plan review and corrections
  10. Plumbing permit drawing questions

What permit plumbing drawings are and who signs them

A permit set has a different reader from a rough-in sketch. The sketch tells an installer where pipe, fittings and fixtures go. The permit set lets a plan examiner who has never seen the building follow each system and judge it against code. New York City's plumbing code asks for a clear description of the work in proportion to the complexity of the project (section 106), so one relocated sink needs far less paper than a gut renovation.

Signing rules are local. In New York City only a professional engineer (PE) or registered architect (RA) licensed by the state may file plumbing plans, and that same professional can certify that they meet code. Ask your own building department who may prepare and seal the sheets before anyone starts drafting.

Review all the existing plumbing the project will touch before design begins, because that survey shows whether the proposed work can comply. Allow time for the base drawings as well. Drawing the building plans typically takes one or two days for a small project and three to four for a larger one. The plumbing plan is generated from the architectural floor plan, so the floor plan has to be settled first.

What the permit set must contain

Departments name the sheets differently, but most sets of plumbing drawings come down to the same parts. The table follows New York City practice.

Sheet or elementWhat it has to show
Cover or title sheetProject location and vicinity shown graphically, applicable codes, notes; a drawing index is recommended
Site plan, when work is outside the buildingStorm and sanitary lines, drywells, yard drains, domestic water supply, backflow devices
Floor plansExisting and proposed conditions, all fixtures, gas, water, sanitary and storm piping, sprinkler and standpipe lines off the domestic supply
Riser diagramsSanitary, storm and vent stacks, hot and cold mains and gas supply, with elevations across floors
DetailsEnlarged sections and elevations where the plan is too small, mounting details
SchedulesFixtures, equipment, valve and pipe identification, insulation ratings
Control diagramsControls for the plumbing equipment

Each sheet also carries the address, the nearest street, a north arrow, the scale, and the name of the person who drew it with the date.

Keep four systems visibly separate throughout: pressurized domestic water, gravity sanitary waste with its vents, storm drainage, and gas. Specialty piping such as medical gas, grease waste or acid waste is a further category. The IPC and UPC (2024 editions) generally prohibit connecting storm water to the sanitary sewer, though the local rule should be confirmed. The set should also show interceptors, sumps and drainage pits, and demonstrate accessibility for people with disabilities.

More than one code applies. In New York City the plumbing code covers water piping, sanitary and storm drainage, vents and fixtures. Gas piping falls under the fuel gas code. Sprinklers, standpipes and penetrations of fire-rated walls belong to the building code, and the energy code can apply on top.

Plumbing sheets usually travel inside a wider permit package of building plans, floor plans, structural information, sections and elevations. In Los Angeles the site plan is the primary sheet, and elevations and landscape plans may also be requested. New buildings add a foundation plan. Additions need a side section that explains how the new part is built.

Drawing the plumbing floor plan

The plumbing plan is a two-dimensional view showing fixture types and positions, pipe sizes and the fittings of the rough-in. Shade the architectural background and draw the fixtures over it, so the plumbing stays the most legible layer on the sheet. Name the rooms. Label doors, windows, counters, appliances and bathroom fixtures, and mark each place where a pipe crosses a fire-rated wall.

Horizontal branches are drawn to scale. Vertical pipe appears only as a symbol, an open circle with a dot for a stack, which is why heights have to be explained on the riser.

A workable drafting order for a house:

  1. Choose the scale. Divide the longest building dimension by the longest sheet dimension in the same unit. A 50 ft plan on a 12 in sheet works out at 1:50, or roughly 1/4 in to the foot.
  2. Locate the point where the sanitary sewer service enters the building and start there.
  3. Work back from that point toward the fixtures. Include the building drain cleanout.
  4. Plot the fixtures at their rough-in dimensions and run branches to them.
  5. Put upper floors on a separate sheet. A stack that drops to the basement must sit at the same spot where it rises through the slab, otherwise the pipe needs an offset.
  6. Write pipe and trap sizes on the plan, then carry the same sizes to the riser.

The standard US scale is 1/4 in to 1 ft. On 11 by 18 in paper that covers a building up to 44 by 72 ft, so anything larger needs a bigger sheet or a smaller scale. Settle the plumbing layout before drafting begins and the sheets will not have to be redrawn around a moved fixture.

Riser diagrams

New York City requires risers wherever piping is new or altered. They cover sanitary, storm and vent stacks, hot and cold water mains and the gas supply, with elevations marked across the floors. The diagram should run through the whole building, from basement or cellar to roof, even when the work sits on one story. That way the reviewer can see what a new branch connects to above and below.

A riser is schematic and has no scale. Sequence and size are what it communicates:

  • pipe size at each floor;
  • vertical risers and drops;
  • branch takeoffs;
  • valves and cleanouts;
  • vent terminations at the roof;
  • connections to equipment.
Cast iron drain stack rising through an open chase between floors

Pipe and trap sizes must appear on both the floor plans and the risers, with the sizing criteria stated. If a branch reads 3 in on the plan and 2 in on the riser, the examiner cannot tell which one is proposed. Anyone new to the format should work through a plumbing riser diagram for a single bathroom group before tackling a multi-floor stack.

Isometric drawings, slope and vents

An isometric shows length, width and height in one view, which makes it the most important drawing for rough-in. It is built on a grid of vertical lines and lines at 30 degrees. Elbows at 45 degrees and wye branches are not to scale in this projection, so read dimensions from the plan.

For work in a slab, mark each penetration with an isometric X, then join the marks using code-minimum fittings and cleanouts that stay accessible. Vent connections, fitting types, invert elevations and cleanout locations all belong on the drawing.

Open under-slab trench with a drain pipe and a spirit level resting on it

Slope is stated here as well. The 2024 IPC and UPC set minimums of 1/4 in per foot for waste lines and 1/8 in per foot for pipe 4 in and larger. Check the edition and amendments your jurisdiction has adopted, then write the slope next to the run. At 1/4 in per foot a 20 ft branch falls 5 in, and the invert elevations have to reflect it.

Fixture schedules and pipe sizes

The schedule links each tag on the plan to a real product. Give every fixture type a tag such as P-1 or L-1, followed by a description, the manufacturer and model "or approved equal", supply and waste connection sizes, mounting type, and the flow rate in gallons per minute (GPM) or gallons per flush (GPF).

Take positions from the manufacturer's rough-in sheet. It gives the distance from the finished wall to the center of the drain, the heights of drain and water connections, faucet spacing, and the backing needed for wall-hung fixtures. These dimensions start at the finished wall, so allow for wall finishes when you measure from bare framing.

Pipe size follows from the fixture unit count on each run. Typical US sizes give a quick check, while the stated calculation governs.

RunTypical size
Supply to a single fixture1/2 in
Small supply branch3/4 in
Trap arm1-1/2 in
Water closet waste3 in
Building drain4 in

Equipment needs a schedule of its own. State UL or similar approval and listing numbers, efficiency ratings and mounting details. Add domestic hot water distribution temperatures and the locations of high-limit devices and alarms for heating and hot water.

Symbols, line types and lettering

The legend assigns a line type to each system: cold water, hot water, hot water return, sanitary waste, vent, storm drain and gas. Many of these look alike on paper, and the legend is how a reader tells them apart. Vents are dashed to distinguish them from drains. Floor drains, cleanouts (CO) and roof drains (RD) get their own symbols.

Pipe material is abbreviated:

  • ABS and PVC for residential drain, waste and vent (DWV) piping;
  • PEX, CPVC or copper for water supply;
  • cast iron below grade or for commercial waste.

Where the code calls for it, add schedules of pipe and valve identification covering color coding, labels and tags, along with the insulation rating of the pipe.

Line types and weights should follow standard conventions so that every reader interprets them the same way. Letter in capitals at least 3 mm tall, about 1/8 in. Keep notes grouped together and orient them to read in the same direction as the title block.

Permit drawings for existing buildings and remodels

New and existing piping must be clearly told apart wherever plumbing alters an existing building. Under New York City rules the additions and alterations have to meet current code, while the rest of the old system does not have to be brought up to date. That relief has a limit. The alteration may not leave the existing installation unsafe, hazardous or overloaded.

A remodel therefore needs a capacity check. Adding a kitchen or changing a bathroom plumbing layout can put new load on equipment and distribution sized for something else, and the design has to verify that both can carry it.

Energy rules also reach plumbing work. In New York City an energy analysis goes on the plans when the job touches piping for heated fluids, the thermal envelope, or the replacement of equipment or controls. Commissioning comes in above 600 kBTU/h of combined input for the replaced equipment.

Submission, plan review and corrections

New York City stopped accepting paper plumbing filings in July 2019. Filings and permit requests go through the DOB NOW: Build portal. Each party on the job, including the owner, needs an NYC.ID account, and the owner must approve the filing online. Depending on scope, the intake form collects work details, a project cost summary, special inspections, energy code progress inspections and the fee payment.

From there the job takes one of two routes. A standard examination sends the drawings to a plan examiner. Professional certification requires the owner's consent and relies on the PE or RA to vouch for compliance; those filings can be audited later. The fire department and the environmental protection, transportation and health agencies may also have to sign off.

After review the department approves the plans or issues a Notice of Objections to the applicant and owner. Objections are resolved in appointments with the examiner. In Los Angeles the building permit comes from LADBS, plans must accompany the application, and review typically takes 2 to 4 weeks. A permit expediter can check drawings against code and talk with the reviewers.

Changes after approval

In New York City a substantive change of scope needs a Post Approval Amendment before that work is done. Minor changes go on the as-built drawings. An as-built set showing all changes is submitted at the end of the project, so mark up a field copy as the pipe goes in.

Check before you submit

  • Pipe and trap sizes agree between plans and risers, and the sizing criteria are stated.
  • Risers reach from the lowest level to the roof.
  • Every stack lines up from sheet to sheet.
  • New and existing work can be told apart at a glance.
  • Fire-rated penetrations are marked and rooms are named.
  • Storm and sanitary drainage are separate.
  • Slopes, cleanouts and vent terminations are shown.
  • Every tag on the plan appears in the schedule, with listing numbers for equipment.
  • The cover sheet lists the codes, and each sheet has a scale, date and north arrow.

Plumbing permit drawing questions

Who can sign plumbing plans for a permit?

It depends on the jurisdiction. New York City accepts plumbing plans only from a professional engineer or registered architect licensed by New York State. Check with your own building department before hiring a drafter.

Do I need an isometric drawing?

New York City asks for riser diagrams when piping is new or altered. An isometric adds slope, vent connections, fittings, inverts and cleanouts in one view and is the main drawing for rough-in. Ask your department whether it wants one in the permit set.

What scale should plumbing plans use?

The usual US choice is 1/4 in to 1 ft, close to the metric 1:50. Risers are schematic and carry no scale.

What is the minimum slope for drain pipes?

The 2024 IPC and UPC set minimums of 1/4 in per foot for waste pipe and 1/8 in per foot for 4 in and larger. The locally adopted code decides.

How long does plan review take?

In Los Angeles review typically takes 2 to 4 weeks. Objections add time because each one has to be resolved with the examiner.

Do changes after approval need new drawings?

In New York City a substantive change needs a Post Approval Amendment before the work proceeds. Minor changes are shown on the as-built set submitted at the end.

Planning a build, a renovation or a new interior?

Send a floor plan, photos or a short description. We will reply with what drawings you need and how the work can be organised remotely.

Discuss your project

Read next

Plumbing Drawings: What a Set Shows and How to Read ItPlumbing drawings explained: plans, riser and isometric diagrams, fixture schedules, symbols, scale, permit needs and how to check a set before rough-in.Plumbing Layout: How to Design a Plumbing Plan for a HouseHow a plumbing layout works: supply lines, drains, vents, slope, symbols, kitchen and bath placement, drawing steps, example plans and common mistakes.Plumbing Riser Diagram: What It Shows, Symbols and How to Read OneWhat a plumbing riser diagram shows, why permit offices ask for it, common symbols, how to read and draw one, basement ejector cases and typical US cost.