Architectural design services cover everything an architect does to take a project from a client's goals to a permitted, built building: pre-design, schematic design, design development, construction documents, bidding and construction administration. In the US the standard basic services follow five of those phases, and the contract decides exactly what you receive in each one.
- Topic
- Architecture
- Updated
- Reading time
- 11 min
- Studio
- Morales Arch & Design

In this article
- What architectural design services are
- What is included: basic, pre-design and additional services
- Pre-design, feasibility and programming
- Architectural design phases step by step
- Residential and commercial projects
- Architectural services in the UK: RIBA stages
- Fees and timelines by phase
- How to choose an architect and agree the scope
- Architectural design services FAQ
What architectural design services are
Architectural design services are the professional work an architect performs to define, design, document and help build a project. On a US project that work usually follows the design-bid-build sequence and is split into five basic phases: schematic design, design development, construction documents, bid or negotiation, and the construction phase. Before them there is often a pre-design or programming stage, which is contracted and paid separately.
Phases exist to make a project manageable. Each one ends with a defined set of documents and a decision point, so the owner knows what is coming next, and the architect knows when the design is approved enough to move on. Owner approval is typically requested at the end of schematic design and again before construction documents begin. An approved plan leaves much less room for argument later in the project.
Clients hire an architect for more than drawings. A good design adds value through light, space and how well the building works, and that shows up in the return on investment. If you are still unsure whether your project needs this level of service, start with whether you need an architect at all.
What is included: basic, pre-design and additional services
The industry splits services into three groups. Where a task falls matters, because it decides whether it is covered by the base fee or billed on top.
- Basic services. The five phases from schematic design through construction administration. Under standard US agreements they also include structural, mechanical and electrical engineering, coordinated by the architect.
- Pre-design and programming. Feasibility studies, site and zoning analysis and the written program sit outside the basic phases. They are offered as a supplemental service or a separate agreement with a separate fee.
- Supplemental or additional services. Anything beyond the basic scope, such as extra design options, computer renderings, physical models, sourcing finishes and fixtures, or revisions requested after approval.

Standard lists of deliverables are only common examples. The contract itself spells out what is delivered in each phase, and an architect is not obliged to produce a document just because it appears on a generic list. Read the scope section of the agreement line by line, and if your project has several consultants, ask for a design responsibility matrix that states who designs what.
Some topics run through every phase regardless of how the work is divided: cost, fire safety, health and safety, inclusive design, planning, procurement, sustainability and, on older buildings, conservation.
Pre-design, feasibility and programming
Pre-design answers whether the project makes sense before anyone draws a plan. A feasibility study may help you decide whether to buy a property, test its development potential and run a zoning and code analysis along with a site analysis.
A typical pre-design checklist looks like this:
- a site survey, prepared by a licensed land surveyor (architects do not produce surveys);
- geotechnical data on the soil;
- asbestos or lead testing when you are working with an existing building;
- a defined scope, goals and program;
- a budget and a schedule;
- selection of the project team.
How the program is built
The program lists the functions the building must hold and the estimated square footage for each type of use. Commercial programming usually produces a spreadsheet of space types and areas plus adjacency and circulation diagrams, and sometimes includes staff interviews or workshops. A widely used six-step method runs through researching the project type, setting goals, gathering information, choosing strategies, fixing quantitative requirements and writing a summary. Goals are grouped as organizational, form and image, function, economic, time and management.
One number to watch is building efficiency: net assignable area divided by gross area. Budget, area and schedule have to be reconciled before drawing starts, or the design will chase a program the budget cannot pay for. Programming is a paid service in its own right, and an architect who quietly rewrites a client's program without flagging it as extra scope may never be paid for that work.
Architectural design phases step by step
The current standard AIA owner-architect agreement (B101-2017) renamed the bidding or negotiation phase to procurement, though most firms still talk about bidding and construction administration. The work in each phase looks like this.
Schematic design (SD)
SD starts with the architect consulting the owner on goals and requirements, which often settles the program. It is also the research phase, when zoning and other jurisdictional restrictions are found and dealt with, and the client's space list is organized by size, location and relationships. Architects typically explore two or three massing and plan options so the client can compare them. The phase ends with an owner-approved design and a cost estimate based on overall project volume.

Design development (DD)
DD works out the mechanical, electrical, plumbing, structural and architectural details, with depth set by what the owner asks for. Owner and architect select materials, finishes, windows, doors, fixtures and appliances, while structural, MEP and energy systems are developed with consultants. DD drawings look finished but are not. A specification book with material, installation and quality requirements is added, the cost estimate is updated, and the phase often closes with a formal presentation and owner approval.
Construction documents (CD)
CD is the largest share of the work. The drawings and specifications describe every detail and material. Several sets are prepared, typically a filing set for the building department and a construction set the contractor prices from. If the set is not 100 percent complete when it goes out to bid, that is noted on it.
Bidding or negotiation
The owner can take competitive bids or work directly with one contractor. Bid documents often include an advertisement for bids, instructions to bidders, a bid form, the owner-contractor agreement and a payment bond, and complex projects benefit from a pre-bid meeting. The architect answers bidders' questions and issues clarifications. Any negotiation on price or scope should finish before the construction contract is signed, and the award is made with a formal letter of intent.
Construction administration (CA)
Construction-phase services are at the owner's discretion and run from the construction contract to the final certificate of payment. Site visits can be daily, weekly or monthly. The architect writes field reports, checks contractor billings against the work done, reviews materials, issues modifications and draws sketches to resolve on-site questions. If the work grows beyond the agreed scope, a change in services may be issued.
| Phase | Typical deliverables |
|---|---|
| Schematic design | Site plan, preliminary floor plans, sections, elevations, overall dimensions, preliminary systems and materials, construction cost estimate; study models, perspectives or renderings optional |
| Design development | Fully dimensioned plans, sections and elevations, door and window details, outline specifications, updated cost estimate |
| Construction documents | Detailed drawings and specifications, permit filing set, construction set for pricing |
| Bidding | Bid package, answers to bidder questions, clarifications, letter of intent |
| Construction administration | Field reports, payment application reviews, material reviews, sketches, modifications |
Residential and commercial projects
The phases as usually described reflect commercial practice, and residential work can differ. A house rarely needs formal public bidding, and its program is a list of rooms rather than a departmental spreadsheet. Either way, the phases you are paying for are normally listed in the contract, so check them there. For homes, a residential architect will usually adapt the scope to the size of the job.
Permits usually sit with the architect, who submits the permit set and responds to the comments and corrections the building authority sends back.
Contractor selection follows different rules for public and private owners. Public entities are bound by laws on how a contractor is chosen. Private owners can pick a builder on qualifications and negotiate, or collect several quotes and compare them.
Visuals are another difference worth agreeing early. Computer renderings are usually an add-on to schematic design rather than part of it, so if you want them, see how architectural 3D modeling is scoped and priced.
Architectural services in the UK: RIBA stages
In the UK the RIBA Plan of Work 2020 replaces the US phase names. It divides briefing, design, construction and use into eight stages, each with defined outcomes and information exchanges. Core strategies run across all stages, covering conservation, cost, fire safety, health and safety, inclusive design, planning, procurement and sustainability.
Specialist work is handled through overlays added to the plan: DfMA (2021), Passivhaus (2023), Security (2023), Inclusive Design (2023), Engagement (2024) and Smart Building (2024).
Under the amended Building Regulations, a Principal Designer must be appointed on projects that need building control approval. RIBA keeps a register of Principal Designers and lists over 4,000 chartered practices across the UK. Typical domestic commissions range from a home extension to a new-build eco-house or the restoration of a listed property.
Specialist architects include conservation architects and client advisers who represent the owner on large or complex projects. Their fees are usually time-based.
Fees and timelines by phase
Architects often express the total design fee as shares allocated to each phase. The table compares the AIA best-practice rule of thumb in the US with the split used by one New York firm in 2026. The total fee itself is a separate question, covered in how much an architect costs.
| Phase | AIA rule of thumb (US) | New York firm, 2026 (typical range) |
|---|---|---|
| Schematic design | 10% | about 15% (10–25%) |
| Design development | 25% | 20% (10–25%) |
| Construction documents | 40% | 40% (35–50%) |
| Bidding / procurement | 5% | 5% |
| Construction administration | 20% | 20% (20–30% or more) |
The split moves with the scope. Several design options, physical models or 3D renderings shift more of the fee into SD and DD. If the architect sources finishes and fixtures for you, the construction administration share rises. Pre-design and programming are billed outside these percentages.
How long design takes
Durations depend on size and complexity. One model for a project of about 5,000 hours of design work gives roughly 2 months for SD, 4 for DD, 6 for CD, 2 for procurement and 24 months of construction. For projects over $1 million, one US university plans SD 3–6 months, DD 5–7 months, CD 4–6 months, bidding 4–6 weeks and construction administration 3–20 months.
How to choose an architect and agree the scope
Start from the phases. Decide whether you need the full sequence from pre-design to construction administration or only part of it, such as design through permit drawings, and make sure the proposal names each phase and its deliverables.
Questions worth settling before you sign:
- Is programming or a feasibility study part of the fee, or a separate agreement?
- Which engineering disciplines are included, and who coordinates them?
- How many design options will you see in schematic design?
- Are renderings and models included or extra?
- Who submits the permit set and answers the building department?
- How often will the architect visit the site during construction, and what triggers a change in services?
On specialist projects, look for matching experience: conservation work on older or listed buildings, or a client adviser for a large and complex scheme. On a UK project that needs building control approval, confirm who will act as Principal Designer.
Architectural design services FAQ
What do architectural design services include?
Basic services cover schematic design, design development, construction documents, bidding and construction administration, usually with structural, mechanical and electrical engineering. Pre-design, programming, renderings, models and extra options are typically separate or additional services. The contract defines the exact deliverables.
What are the phases of architectural design?
In the US: schematic design, design development, construction documents, bidding or negotiation (now called procurement in AIA agreements) and construction administration, often preceded by pre-design and programming. In the UK the RIBA Plan of Work uses eight stages.
Who handles permits?
The architect typically submits the permit set prepared during construction documents and responds to the building authority's comments and corrections.
How long does architectural design take?
It depends on project size. On projects over $1 million, typical ranges are about 3–6 months for schematic design, 5–7 for design development and 4–6 for construction documents, plus 4–6 weeks of bidding.
Is construction administration required?
No. Construction-phase services are at the owner's discretion. When included, they run from the construction contract to the final certificate of payment and usually take about 20% of the design fee.
Is programming included in the architect's fee?
Usually not. Pre-design and programming sit outside the five basic phases and are contracted as a supplemental service or a separate agreement with its own fee.