Do I Need an Architect for My House or Remodel?

You need an architect when your building department asks for stamped architectural plans, or when the work changes the structure, the footprint or the layout of the house in a serious way. For cosmetic updates, repairs and simple structures, an interior designer, a draftsman or a good contractor is usually enough. Local rules come first, so call the building department before you call anyone else.

Topic
Architecture
Updated
Reading time
11 min
Studio
Morales Arch & Design
Single-family house with an addition being framed at the back
In this article
  1. Do I need an architect? The short answer
  2. When is an architect required by law?
  3. When hiring an architect is worth it
  4. When you don't need an architect
  5. Architect, designer, draftsman, engineer or contractor
  6. Which professional for which project
  7. What an architect costs
  8. Risks of hiring an architect, and of going without
  9. Design-build, and how to decide
  10. Frequently asked questions

Do I need an architect? The short answer

Four things settle it for most homeowners: what the local authority requires, whether the structure or building shell changes, how big the job is, and how much you care about the way it looks.

One rule of thumb used by architects themselves is easy to apply. If no walls move or come out, no plumbing, appliances or electrical points shift, and nothing changes on the exterior, an interior designer suits the job better. Once one of those items is on the list, talk to an architect at least once.

The rough split looks like this:

SituationArchitect?
Jurisdiction asks for stamped architectural plansRequired
New custom homeEssential in practice
Major addition or large internal remodelWorth it
Difficult zoning, environmentally critical site, special neighborhood rulesWorth it
Simple home built from existing plansA draftsman may be enough
Repair or restorationOften none, or a reduced scope
Tool shed or truly basic additionA skilled contractor or design-build firm can handle it
Paint, finishes, furnitureNo
Driveway or other pure site workNo, call a civil engineer

When hiring an architect is worth it

A custom home tops the list, since every decision about form, structure and construction documents is still open. Major additions and big internal remodels come next. Renovations are one of a kind, so there are no ready-made plans to buy. Even when you only want to copy a room from a magazine, somebody has to check that it suits the structure you have.

Complicated zoning, an environmentally critical area or a neighborhood with its own design rules is another strong reason. An architect will usually steer that process far better than a general contractor. The last reason is taste. If appearance matters to you, consider an architect seriously, because even a simple builder-led garage can disappoint when it is finished.

What you get for the fee

To be licensed in the US, an architect spends at least three years working under a licensed architect and passes six exams. The license carries responsibility for the life safety of the people who will use the building. On a house, that training turns into practical things:

  • Knowledge of construction methods, building code and permit approval.
  • An eye for which walls carry load and what a new layout will do to the HVAC system.
  • Options you would not have thought to ask for. Moving a sink, for example, may call for an extra window next door, and it is better to plan both at once.
  • Better spatial flow, energy efficiency and sustainability.
  • Details resolved on paper before anyone starts cutting. Measure twice, cut once.
  • Project management when you want it: coordinating engineers, consultants and contractors against time and budget.

When you don't need an architect

Interior refreshes and cosmetic updates rarely justify one. Painting and minor fixes need no professional plans, and a remodel that keeps every wall, pipe and outlet where it is can go straight to an interior designer.

Repair and restoration often run without an architect, or with a limited scope where the architect handles one part only. A tool shed or a very plain addition can go to a skilled general contractor or a design-build firm. A new driveway is a civil engineering job from start to finish.

Doing the labor yourself does not change the requirement. New foundations or rewiring call for professional plans, because the house has to stay structurally sound no matter who holds the tools.

Architects turn this kind of work away all the time. If you describe your project to several firms and they all refer you elsewhere, you have your answer.

Architect, designer, draftsman, engineer or contractor

Much of the confusion comes from overlapping titles. Sort them by what each one decides.

ProfessionalHandlesCall when
ArchitectForm, flow, structure, construction documents; often stays on for questions during the buildYou need layout advice, or the building shell changes
Draftsman or technologistTurns an existing concept into buildable, approval-ready drawingsThe design is already decided
Structural engineerLoad-bearing elements, foundations, beam sizesAnything that carries load is touched
Interior designerFinishes, furnishings, lighting, millwork, cabinetryThe shell stays and the rooms change
ContractorDay-to-day build, schedule, budget, materialsThere is something to price and build

A draftsman usually adds no conceptual thinking and no long-term view of the house. That is fine when you know exactly what you want. When you do not, ask for a licensed architect. Engineers do not replace architects either, and most complex custom homes need both.

The line with interiors is blurrier. A common rule of thumb gives walls and roof to the architect and finishes, furniture and fabrics to the interior designer, with a grey zone between them. Read more on what an interior designer does if your project sits there. Home designers fall roughly into four kinds: the technical one (technician or technologist), the creative architect led by design, the interior architectural designer, and the interior designer who works with furniture and fabrics. You will also meet the architectural designer, a title close to these.

Which professional for which project

The matches below are a starting point. Local permit rules still decide who signs the drawings.

ProjectBest fitWhy
Kitchen or bathroom onlyInterior designerArchitects rarely take jobs this small unless they belong to a larger renovation. Kitchen companies design for free but push their own products
Rear additionTechnical architect if simple, creative architect for a statementDepends on how much design you want
Attic conversionTechnical specialistMostly structural and thermal upgrades
New buildCreative architect, or a technologistArchitect for ambition, technologist when cost or zero carbon drives the job
Whole-house renovationCreative architect or interior architectural designerA structural engineer may be needed too
Opening up to an open planInterior designer or interior architectural designer, plus a structural engineerThe engineer must size the beam
Attic being converted with new insulation between rafters

For an addition, set the design choice against the build price early. Our guide to house extension costs helps you see how large the design share is.

What an architect costs

Fees are charged by the hour, as a percentage of the construction budget, or by floor area. Typical figures in the Chicago area look like this:

Fee modelChicago area
Hourly$80-150
Percentage of budget8-15%
By areaAbout $1,200-5,000 per 1,000 sq ft

Plan for the fee before you fix the construction number. A common rule of thumb adds about 25% to the construction budget to cover design fees and contingency together. See how much an architect costs for a closer look at fee models.

The fee can pay part of itself back. On major renovations, an architect who handles code compliance, planning and building permits often makes the whole job more cost-effective and less stressful.

Risks of hiring an architect, and of going without

A traditional project runs in order: consultation, measuring the existing house, a few concepts, schematic design, then bids from contractors. The design phase usually takes 3-6 months. Because prices arrive last, a design can land well over budget. Then it has to be redone, and the fees already paid are not refundable.

Drawings made without builder input can double the budget. One suite addition went from about $300,000 to $600,000 that way. Smaller gaps hurt as well. If the plans leave out a zero-threshold shower, a linear drain, trim or crown molding, each one comes back as a change order.

With separate firms, you carry the coordination. You become the project manager, every contractor request in the middle of the build goes back to the architect and adds cost, and warranties from third-party vendors fall outside what the builder covers.

Risks of skipping one

Amateur drawings often fail approval. They also confuse contractors, and that is how renovations get botched. Plenty of owners start without an architect and call one halfway through, when little can still be fixed.

Design-build, and how to decide

Design-build puts both roles under one contract. You get a single point of contact, a design drawn to your budget and, with some firms, a fixed-price agreement. The company uses in-house designers and handles permits, and it can also work with your own architect if you prefer one.

Separate firms work well too, provided the architect and the builder are both involved from the start. Early input from the builder prevents costly revisions later.

Before you commit, take these steps:

  1. Call the building department and write down what it requires.
  2. Talk to several architects. Ask whether your scope needs them, and look for a pattern in the replies.
  3. Talk to several builders and ask bluntly whether the job needs an architect. Some only work with one.
  4. Question anyone who is too eager. An architect who begs for a powder room should be able to tell you why.
  5. Start early. In a busy market good architects keep waiting lists.

Frequently asked questions

Do I need an architect to draw plans?

Not always. A new custom home benefits from one from the first sketch, while a simpler home based on existing plans may only need a draftsman. If your jurisdiction wants stamped architectural plans, that decides it.

Do I need an architect to get a building permit?

It depends on the jurisdiction. State rules set the base and cities or counties may go further, so ask your local building department first.

Should I hire the builder or the architect first?

Bring both in at the start if you can. The architect leads the design, and the builder's early pricing keeps that design inside the budget.

Architect or draftsman?

Choose a draftsman when the design is settled and you need drawings for approval. Choose an architect when you want advice on the layout.

Architect or interior designer?

Walls, roof and structure point to an architect. Finishes, lighting, cabinetry and furniture point to an interior designer. Cosmetic remodels may need only the designer.

Do I need an engineer as well?

A structural engineer is needed when load-bearing parts or foundations change, including the beam in an open-plan conversion. Most complex custom homes use both an architect and an engineer.

Do I need an architect for a DIY renovation?

For paint and small fixes, no. For foundations or rewiring you still need professional plans even if you do the labor.

Planning a build, a renovation or a new interior?

Send a floor plan, photos or a short description. We will reply with what drawings you need and how the work can be organised remotely.

Discuss your project

Read next

What does an interior designer do: duties, process and costWhat an interior designer does: space planning, materials, lighting, drawings, budget and site work, how a project runs, how it differs from decorating.Architectural designer: what they do and how they differ from an architectWhat an architectural designer does, how the role differs from a licensed architect, which title rules apply, what designers earn and when to hire one.How Much Does a House Extension Cost per Square Foot and per RoomHouse extension cost in the US, UK and Canada: prices per square foot and per m², by room and type, with permits, hidden costs and ways to save.