EN

Bathroom Renovation Ideas: Planning a Bathroom Remodel by Room Size and Budget

The bathroom renovation ideas worth doing first depend on the size of the room: in a small bath, swap the tub for a walk-in shower, hang the vanity on the wall and enlarge the mirror; in a large one, build the layout around a soaking tub, a curbless shower and layered light. On a tight budget, paint, a matching set of fixtures and better storage change the room without a full gut.

Topic
Extension and renovation
Updated
Reading time
10 min
Studio
Morales Arch & Design
Remodeled American bathroom with a wall-hung oak vanity, large mirror and glass walk-in shower
In this article
  1. Plan the bathroom remodel before picking ideas
  2. Ideas for a small bathroom renovation
  3. Bathroom renovation ideas for large and primary baths
  4. Showers, tubs and faucets
  5. Vanities and bathroom storage ideas
  6. Tile, flooring and materials for a bathroom remodel
  7. Color, style and lighting ideas
  8. Budget bathroom ideas without a full gut
  9. Trends worth paying for and who can help
  10. Bathroom renovation FAQ

Plan the bathroom remodel before picking ideas

Start with three facts about the household: how many people use the room, how much has to be stored in it, and what style everyone can live with.

Then set the budget and rank the items. Put the money into the one or two things that matter most to you, such as the shower, the tub or the counter. For scale, a small bathroom remodel typically runs about $5,000 to $11,000. Furniture needs its own line: a piece can run from a few hundred to several thousand dollars.

Doing the labor yourself can cut the bill if you are handy. Complex work belongs to a professional. Choose durable, waterproof materials throughout. The spending has a longer view as well, since a remodel supports the resale value of the house.

Your situationIdeas to put first
Small bath, full remodelWalk-in shower in place of the tub, wall-hung vanity, recessed storage, large mirror
Small bath, same layoutLight paint, mirrored cabinet, shelves over the toilet and the door, one fixture finish
Large or primary bathSoaking tub as focal point, curbless shower with bench, built-in cabinets, layered lighting
Guest bath or powder roomBold palette, stone sink, striking mirror or light
Little money to spendPaint, hardware, shower curtain, wallpaper, stencils, better accessories

When the bathroom is one room in a larger project, settle finishes and budget for the whole house together. Our guide to home renovation design covers that stage.

Ideas for a small bathroom renovation

Floor area is what you are short of, so the strongest move is to replace the tub with a walk-in shower. Leave out the door or curtain and build in a bench or wall niches.

A floating or wall-mounted vanity clears the floor below it and still holds what you need. Where storage can go elsewhere, a pedestal sink takes up even less visual space. An oval basin softens a room made of straight edges, and an undermount sink with a tile accent behind it suits a small wall.

Mirrors expand the room visually. Options include one large mirror above the sink, a run of mirrored cabinets, or a full mirrored wall. Light paint, reflective surfaces and zoned lighting help in the same way. Keep the counters clear.

Build upward with floating shelves, a tall storage tower and a medicine cabinet recessed into the wall. Look as well at the space above the toilet, behind the door and over the door frame.

A compact room can still take bold color or expensive finishes. One patterned feature wall, in paint or wallpaper, works well. So do marble counters, brass fixtures and custom floor tile, and polished surfaces brighten the room by throwing light back.

Bathroom renovation ideas for large and primary baths

A big room needs a focal point, and a soaking tub is the usual answer. It can be freestanding, built in or set in a corner, and made of acrylic, porcelain or stone. A pendant or chandelier adds mood. In a cold climate, a gas or electric fireplace near the tub or a seating area is a luxury to consider.

Who sees the room should decide its character. A bathroom that guests use can be a statement, with a bold palette, rich materials, a stone sink or counter and a mirror or light that draws the eye. A private primary bath works better muted: warm neutrals, soft warm light, wood tones, plush rugs and a single accent color.

Designers now push primary baths toward wellness. That means more floor area if the remodel allows it, rounded shapes, simple decor, plants, a large tub, a generous shower and deep sinks. Growing the room takes space from somewhere else or calls for an addition, and these house extension ideas show ways to do it.

Water features such as an indoor waterfall wall or a small fountain belong to the same spa mood, though they are a poor fit for homes with young children or pets.

Showers, tubs and faucets

With space to work with, a walk-in shower can be curbless, enclosed in glass or open from two sides. Equip it with a rain head, body jets or a bench. One practical combination is a rain head, a handheld sprayer and a bench with drawers under the seat.

If you want both a tub and a shower, an L-shaped layout places a separate shower cubicle beside the tub. Put a stone mosaic back wall behind a glass door. Where a standard tub will not fit, look at a space-saving soaking model; the Japanese style bath is another direction to explore.

  • Wall-mounted faucets need less cleaning.
  • Rounded or lozenge-shaped fittings give a softer look.
  • Chrome resists grime.
  • Fittings that save water and energy are in demand.
  • Glass shower doors with an anti-spot treatment are easier to keep clear.
  • Doorless showers and grab bars are worth discussing at the layout stage.

Vanities and bathroom storage ideas

Choose a vanity that fits the layout, since an oversized one spoils a small room. Go for a double sink only where there is real space for it. The alternatives are a single basin or an offset one.

Floating vanities are the leading trend and sit comfortably in transitional interiors. Furniture-style pieces stand on feet or turned posts. Soft-close drawers and doors are now common, and push-to-open fronts without handles are the fashionable step beyond; flat fronts are preferred to ornate panels. Another trend is to match the bathroom cabinets to those in the kitchen, so if both rooms are being redone, fix your kitchen design first.

Open drawer of a floating bathroom vanity with folded towels and small baskets

Storage built into the vanity or a medicine cabinet is a cheap way to make the room work better. Other places to find it:

  • A floor-to-ceiling mirrored cabinet, which can also hide the laundry basket.
  • A deeper medicine cabinet with outlets inside.
  • Open shelving for towels, with baskets and trays to hold small items.
  • Built-in cabinets in a large bath.
  • Recessed shelves or drawers, a false bottom in a cabinet, or a shelf above the door.

Hinges, drawers and accessories are handled every day. Buy the best you can afford, ideally with a lifetime warranty.

Tile, flooring and materials for a bathroom remodel

Grey leads for tile, followed by clay and taupe. If that feels too quiet, a pastel blue or green backsplash against neutral surroundings adds color in a small dose. Wall tile can run right up to the ceiling, and large-format tile is an option there. Subway tile looks fresher in a vertical or graphic layout.

Mosaic comes in limestone, marble, glass and metallic versions. Wood-look tile is another choice, and a pebble floor gives a natural feel.

Tile, stone and wood samples laid out on an unfinished bathroom floor

Natural materials are the strongest direction. Think stone sinks, rough stone or wood counters, natural oak cabinets, handmade tile, stone floors and wood paneling, with marble on the floor, walls or counter. For a spa look, combine a travertine sink with a copper or bronze faucet and stone walls.

If upkeep worries you, choose quartz over marble for the counter, pick durable fixtures, and specify anti-spot shower glass.

Color, style and lighting ideas

Color and style

A light palette of white, beige or grey brightens even a large bathroom. Towels, art and rugs then carry the color. After decades of white and cream, strong color is coming back too: jewel tones, deep emerald, retro orange, and the pastel blues and pinks of the 1940s.

Biophilic design mixes plants, natural materials and water elements for a healthier feel. Ferns, orchids and succulents are good candidates. For a themed room, try a seaside blue powder room, vintage brass mirrors, or an Asian-inspired spa with a wooden tub and bamboo.

Lighting and daylight

Plan lighting in layers. Overhead fixtures light the whole room, task lights serve shaving and makeup, and accent lights set the mood. Put them on dimmers, and use sconces or pendants where they suit the style. A backlit mirror is another option at the sink.

Daylight makes a bathroom feel expansive, so in a bigger remodel enlarge a window or add a skylight. If neither is possible, use bright, efficient fixtures and light-reflective surfaces.

Budget bathroom ideas without a full gut

If the layout already works, you can stop at the surface. New paint, hardware, a shower curtain, some tile or wallpaper will shift the look at low cost. Replacing the faucets, shower head, towel racks and lights in one luxury finish updates the whole room without an overhaul.

  • Wallpaper. Peel-and-stick can be changed when you tire of it; traditional paper is a permanent choice.
  • Stencils. Use them for a border, a mural or a pattern painted over floor tile.
  • Repurposed furniture. An old piece can become a vanity, as long as you allow for a new sink and plumbing supplies.
  • Spa details. A floating shelf, a tray with eucalyptus, Epsom salt, a candle and good towels.

Bathroom renovation FAQ

How can I get more storage in a small bathroom?

Use the wall above the toilet, the back of the door and the space over the door frame. Add a recessed medicine cabinet, a tall tower and a vanity with built-in storage.

Which colors suit a small bathroom?

White, neutrals and pastels make it feel larger. A bold or patterned feature wall also works if you want more character.

How do I make a small bathroom feel luxurious?

Choose quality fixtures, a frameless glass shower and a good mirror. Marble counters, brass fixtures and custom floor tile take it further.

How do I make a small bathroom look bigger?

Paint it in light colors, hang large mirrors, fit a pedestal sink or floating vanity, and clear the counters. Reflective surfaces, daylight and zoned lighting add to the effect.

How much does a small bathroom remodel cost?

Typically about $5,000 to $11,000, depending on finishes and how much of the layout changes. Doing some of the labor yourself can lower it.

Planning a build, a renovation or a new interior?

Send a floor plan, photos or a short description. We will reply with what drawings you need and how the work can be organised remotely.

Discuss your project

Read next

Home Renovation Design: Ideas, Budget and PlanningHow to design a home renovation: setting priorities, layout and material ideas, US cost ranges per room and per sq ft, permits, timelines and the order of work.House extension ideas and design options for more spaceHouse extension ideas compared: rear, side, wrap-around, second story, loft, garage, basement and ADU, with design tips, planning limits and value.Kitchen Design: A Practical Guide to Designing the KitchenKitchen design from brief to build: layouts, work triangle, aisle and counter dimensions, storage, ventilation, lighting, styles and remodel order.