What does an interior designer do: duties, process and cost
An interior designer plans how the inside of a building works and looks, then documents that plan so a contractor can build it and suppliers can deliver to it. The job covers layout, lighting, materials, built-ins, furniture, budget and code requirements, and it often runs through construction to the day the furniture is placed.
- Topic
- Interior design
- Updated
- Reading time
- 12 min
- Studio
- Morales Arch & Design

In this article
- What an interior designer does, in plain terms
- Interior designer duties and responsibilities
- How an interior design project runs, step by step
- Interior designer vs interior decorator vs architect
- What interior designers do in homes and commercial spaces
- Who an interior designer works with
- Interior designer qualifications and skills
- When to hire an interior designer and what it costs
- Questions about interior designers
What an interior designer does, in plain terms
Choosing a sofa and a paint color is a small part of the work. An interior designer starts from how people use a room: where they come in, what they carry, which path they walk, what annoys them every day. From that the designer works out the layout, then the lighting, surfaces, storage and furnishings that make the layout pleasant to live or work in. Creative judgment and technical knowledge carry equal weight, because the result has to look right, function properly and suit the person paying for it.
Four areas of responsibility run through nearly every commission: planning the space, setting its look, holding the budget and coordinating the project. The share of each varies. On a furnishings-only job the designer may spend most of the hours on selection and purchasing. On a gut renovation, drawings and answers to the contractor take over.

The size of the job varies just as much. Designers take on a single bedroom or a complete house, a new build or a renovation, and the same working logic applies: understand the needs, fix the layout, choose what goes into it, see it installed.
Interior designer duties and responsibilities
The list below covers the usual scope. A contract may take all of it or a few lines.
| Duty | What the designer actually does |
|---|---|
| Space planning | Sets circulation, scale and furniture positions so that movement and daily use work, from a small home to a large office |
| Materials and finishes | Selects flooring, countertops, tile, paint and fabric; checks durability, cleaning, maintenance and sustainability |
| Lighting | Draws a layered lighting plan and works with daylight as well as choosing decorative fixtures |
| Color | Uses the effect of color on mood: calm for a bedroom, livelier for a restaurant |
| Furniture, fixtures and equipment (FF&E) | Judges pieces on ergonomics and function, and designs custom furniture when nothing on the market fits |
| Drawings and visuals | Produces mood boards, sketches, plans, elevations, 2D and 3D images, schedules and specifications |
| Budget and sourcing | Estimates costs, finds suppliers, presents schemes that fit the figure agreed with the client |
| Code and accessibility | Plans fire exits, wayfinding and ADA access, and keeps the interior within the building code |
| Site coordination | Schedules, answers contractor questions, checks that the built work follows the design |
Material selection is more technical than it looks from outside. A carpet or wall panel gets reviewed for acoustics, flammability, off-gassing, allergens and static as well as for wear and ease of cleaning. Natural stone for a countertop or a sustainable floor is chosen for how it will behave in that room, and for how it sits next to everything else.

Building systems matter too. Heating, ventilation, airflow, electrical and plumbing codes all limit what can be specified. A wrong specification can hold up the work, add cost or leave the finished interior out of code.
The designer also has to solve problems when the plan meets reality. A tile goes out of stock, a beam turns up where a duct was meant to run, and the fix has to keep both the design and the schedule intact.
How an interior design project runs, step by step
Offices name the phases differently, but a full-service project follows much the same order. The client signs off each phase before the next one starts.
1. First call and pre-project
The inquiry call establishes feasibility, scope and budget. Come with inspiration images and a list of what works in the current space, what fails, and how you move through it during the day. The designer should set out at this point how involved you will be and where the boundaries are.
2. Programming, site visit and measuring
Interviews about lifestyle and needs come before any design. Existing plans are reviewed, the rooms are visited, measured and recorded as built. An error of even 1/4 inch can turn out expensive once cabinets are ordered to it. Measuring may be done by a third party the client hires, and the result usually becomes a 3D model of the existing home that all later work is built on.
3. Schematic design
Sketches, reference imagery, plans, sections, material boards and early renderings test the style, color, function and mood. Layout options appear here: move a wall, relocate the shower, open the kitchen. Expect several rounds. At the end of this phase a contractor can be brought in for early pricing, so that the scheme stays within the budget.
4. Design development
The chosen scheme gets its detail: elevations, perspectives, renderings, built-in elements, FF&E selections and physical samples you can touch.
5. Permits
Permitting can run in parallel with design development. Allow 1 to 2 weeks to formalize the set and assume one round of corrections. In Seattle in 2022, review of a building permit took about 12 to 16 weeks; other jurisdictions differ, and some small jobs qualify for an over-the-counter permit.
6. Construction documents
This is the instruction manual for the contractor, in drawings. It shows detailed floor plans with consultants' specifications, lighting and material schedules, the position of every ceiling light, the countertop edge profile, how one floor meets another, the seat height of a banquette, and the low-VOC paint to be used.
7. Construction administration
During the build the designer answers requests for information, reviews finish submittals and approves shop drawings. How much of this you buy can be tailored to the budget.
8. Purchasing, installation and close-out
Furniture and decor are ordered, delivered and placed. After the reveal and photography, the designer goes back over the project with the client to note what was learned.
Interior designer vs interior decorator vs architect
The titles overlap in conversation. Decorators are professionals too, and both can draw plans and pick palettes, furniture, art and plants. The difference lies in how far into the building the work goes.
| Decorator | Interior designer | Architect | |
|---|---|---|---|
| Main concern | Appearance and furnishings | The whole interior: layout, function, lighting, built-ins, furnishings | The structure and how the building is divided |
| Typical work | Furniture, textiles, color, art | New builds, renovations, furnishings-only projects | The shape of the building the interior sits in |
| Renovation | Usually does not run it or change structure | Plans changes, coordinates, follows the work on site | Works alongside the designer and engineers |
| Design phase | Shorter | Longer: structure, lighting layers, millwork elevations, plumbing, tile | Depends on the project |

Both a decorator and a designer go through intake, concept, detailed design, purchasing, installation and a final reveal. The designer's version takes longer at both ends, since there is more to resolve on paper and a renovation to oversee before furniture arrives. A designer can provide a decorator's services. The reverse does not hold.
A designer can propose architectural changes such as removing a wall or adding a window. Authority to carry them out depends on the jurisdiction and on whether stamped drawings are required, so the structural side is worked out with an architect or engineer. If your project sits closer to the building than the interior, compare the role of an architectural designer.
What interior designers do in homes and commercial spaces
In a home the brief comes from one household's habits. A designer may plan the storage in an entry, move a shower, set out a kitchen design around how the family cooks, or choose a bedroom palette that is easy to sleep in.
Commercial interiors serve staff, visitors and a business at once, and each sector pulls the plan a different way.
- Offices: layouts that help people collaborate, ergonomic workstations, branding built into the space.
- Retail: shelves, displays and lighting arranged to guide shoppers through the store.
- Hospitality: lobbies, guest rooms and dining areas tied to the theme of the brand.
- Healthcare: hospitals and dental clinics with calm palettes, accessible routes and efficient layouts.
- Education: schools and training centers that depend on good lighting, acoustics and ergonomic furniture.
Many practitioners specialize. Kitchens, bathrooms, restaurants, corporate interiors, healthcare, sustainable design and universal design are all established niches, and some designers fit out boats, aircraft and RVs. For a business premises, look for a commercial interior designer, because public buildings bring fire exits, wayfinding and accessibility into the plan.
Who an interior designer works with
On any project beyond furnishings the designer is one of several specialists. The architect shapes the structure and divides it into rooms, and the designer works inside that frame. Builders, structural engineers, and electrical and mechanical consultants feed into the same set of drawings. To be useful at that table, a designer has to understand walls, beams and floor build-ups well enough to know what a change will disturb.
Project management is often part of the appointment. The designer keeps the budget, finds and orders products, sets the schedule and supervises contractors, staying on through construction so that the built room matches the drawn one. Suppliers are a large part of this work. Designers tend to have accounts with trade-only furniture lines and a list of contractors they trust, which a homeowner would struggle to assemble for one job.
Client communication holds it together. Consultations, mood boards and regular presentations keep expectations aligned before money is spent.
Interior designer qualifications and skills
In the United States the rules depend on the state. Some require a degree or a license before you may call yourself an interior designer, and others have no requirement at all. Registered interior designer is an optional certification, and the professional qualification most people mean is NCIDQ.
In the UK the title is not regulated by government. As of 2022, accreditation by SBID, a professional body, calls for three years of education, three and a half years of training, professional indemnity insurance and 24 CPD points every year. Entry routes there include a university course (2 to 3 A levels) and a college course or apprenticeship (4 to 5 GCSEs).
The daily skill set is broader than taste:
- design knowledge, including color theory, lighting and spatial dynamics
- drawing and modeling software
- an understanding of buildings and construction
- procurement and budget control
- clear presentation and listening
- problem solving, often under deadline pressure
- awareness of current directions such as biophilic design and smart home automation
When to hire an interior designer and what it costs
Hire a designer if walls will move, the flow between rooms has to change, or the job includes new lighting, tile or built-ins. For a furnishings-only refresh, a decorator is enough. A designer also saves you from expensive mistakes, such as furniture that does not fit the room.
Fees follow scope, experience and location. Designers usually charge more than decorators because they take on more. In the US in 2024, hourly rates ran from about $50 to $200, with 10 to 15% of the total project cost as the percentage alternative. Among professional designers in the US and Canada the rate can be $100 to $250 an hour, depending on experience. Fixed packages exist, with a risk of overruns. Get several quotes for the same written scope; the fee models are compared in our guide on how much interior design costs.
Before you sign, ask for:
- a portfolio with work close to yours
- the billing method and what triggers extra charges
- whether the designer can work within a limited budget
- how far site involvement goes, and who handles permits
- how many decisions you will be expected to make, and when
Questions about interior designers
What is the difference between an interior designer and a decorator?
A decorator deals with appearance: furniture, color, textiles and art. An interior designer also plans the space, lighting, built-ins and renovation work, and coordinates the people who carry it out.
How much does a home interior designer cost?
In the US, about $50 to $200 an hour in 2024, or 10 to 15% of the total project cost. Rates of $100 to $250 an hour also occur among professionals in the US and Canada, depending on experience. Location and scope change the figure.
Do interior designers work on small projects?
Yes. Commissions range from one room to a full-home redesign, and the amount of site involvement can be scaled to the budget.
Can an interior designer move walls?
A designer can plan the change and draw the layout. Whether the designer may carry it through alone depends on local rules and on whether the drawings need a professional stamp, so structural changes are coordinated with an architect or engineer.
Do I need a licensed designer?
It depends on where you are. Some US states require a degree or license to use the title, others do not, and the UK does not regulate it. Check your state's rules, and ask about NCIDQ certification or, in the UK, SBID accreditation.
Architectural designer: what they do and how they differ from an architect
Kitchen Design: A Practical Guide to Designing the Kitchen
Commercial Interior Designer: What They Do and How to Hire One