EN

Online Drafting Tool Guide: Browser CAD, Free Options and Prices

An online drafting tool is CAD software that runs in a web browser, so you can draw, dimension and share 2D plans without installing anything. For precise, scaled drawings, the browser apps worth a look are AutoCAD Web, Onshape and SketchUp Free, with free desktop programs such as QCAD and LibreCAD as the fallback when the web version runs out of power.

Topic
Working remotely
Updated
Reading time
13 min
Studio
Morales Arch & Design
Laptop on a kitchen table showing a 2D floor plan in a browser, tape measure and pencil sketch beside it
In this article
  1. What an online drafting tool does
  2. Drafting tools vs diagram and whiteboard apps
  3. Best online drafting tools that run in a browser
  4. Online floor plan tools for homeowners and designers
  5. Free and low-cost desktop CAD when the browser is not enough
  6. Online drafting tool pricing and license limits
  7. File formats, scale printing and handing drawings over
  8. Limits of online CAD tools
  9. How to choose an online drafting tool
  10. Online drafting tool FAQ

What an online drafting tool does

An online CAD tool lets you create, edit and manage technical drawings inside a browser. Nothing gets installed, so the same project opens on a Mac, a Windows PC, a tablet or a borrowed laptop at a client's house. CAD in general covers architectural, electrical and mechanical drawings, and many tools also serve laser cutting, CNC work and circuit boards. For home and building work the main output is the floor plan.

A floor plan shows how rooms, furniture and zones relate to each other. It is the first real check on whether a space works before anyone spends money on materials or permits. Architects, interior designers, real estate professionals and homeowners all draw them, with very different levels of precision.

Printed 2D plan and a 3D foam massing model side by side

2D drafting vs 3D modeling

2D CAD draws projected views on two axes: plans, elevations and sections as flat lines. There is no model behind them. 3D CAD builds a model first and then generates the views from it. 2D tools carry only the essential functions, so they cost far less and take less time to learn.

For quick changes and small projects 2D is usually faster. If you will never need a render or a 3D model later, staying in 2D is a sensible choice. When the project does need a model for presentation or coordination, that becomes a separate job, covered in our guide to architectural 3D modeling.

Drafting tools vs diagram and whiteboard apps

Search for "online drawing software" and you get mostly diagram and whiteboard apps. They are fine for some jobs, but they work differently from CAD and the difference shows the moment you need an exact dimension.

Diagram tools such as EdrawMax Online, Microsoft Visio, diagrams.net, SmartDraw and tldraw are shape-first. You drag prebuilt shapes, connect them and export the result. They keep edit history, handle permissions and export to many formats. EdrawMax and SmartDraw even ship floor-plan templates and CAD-style symbols, and SmartDraw saves to SharePoint, OneDrive, Google Drive or Dropbox with shareable links. What they lack is CAD-grade precision.

Whiteboards like Canva, FigJam, Miro and Mural give you live cursors, version history and export to PDF or images. They are good for brainstorming a room layout with a client. They are not built for scaled drawings.

TypeGood forWeak at
Whiteboard appsIdeas, zoning sketches, client workshopsScale, dimensions, DWG output
Diagram appsQuick floor-plan layouts with templates and symbolsExact geometry, layers, drawing standards
Online CADScaled plans, dimensions, annotation, DWG/DXF exchangeHeavy automation, complex geometry in the browser

Best online drafting tools that run in a browser

These are the browser options that actually produce drawings rather than diagrams.

AutoCAD Web

The web app looks like the desktop interface and has the core drawing, editing, dimensioning and annotation tools. You can share a drawing so others view it, comment on it or edit it. It grew out of AutoCAD 360, which let people create, edit and review CAD files online, draw with a stylus on a phone or tablet and share in real time through the cloud. AutoCAD itself runs on Mac, Windows, Android, iPad and the web, so a project can be opened almost anywhere. The web and mobile apps come with an AutoCAD subscription, and there is a 30-day trial.

Tablet with a stylus showing a CAD drawing on a job site

Onshape

Onshape handles 2D drawings with dimensions, tolerances and symbols, and it has a free plan. The catch: on the free plan all your data sits in a public workspace. That rules it out for client projects you need to keep private.

SketchUp Free

SketchUp Free runs entirely in the browser with no download. It imports SKP, JPG and PNG and exports SKP, PNG and STL. You get 10 GB of Trimble Connect cloud storage and access to the 3D Warehouse model library. Push-pull modeling makes it quick for beginners to turn a plan into 3D. It is a 3D-first program, though, so a 2D permit set normally needs other tools on top.

Tinkercad and other beginner tools

Tinkercad is free browser CAD with a ruler and shape combining, aimed at people with no CAD background and at 3D printing. 3DTin is another browser 3D tool that needs WebGL in Chrome or Firefox and exports DAE, OBJ and STL; free work there is public under Creative Commons, and private or commercial use needs the premium tier. ShareCAD, ARES Kudo and Vectary also run in a browser and suit viewing and light 2D or 3D work.

Online floor plan tools for homeowners and designers

If the goal is a furnished home layout rather than a construction drawing, dedicated floor-plan apps are quicker than CAD.

  • Cedreo has templates for houses, apartments, offices and shops, lets you resize rooms freely and switches from 2D to 3D in one click.
  • Planner 5D uses drag-and-drop 2D plans that flip to 3D, with 8,000+ furniture and decor items, on web, iOS, Android and desktop.
  • FloorPlanner has a free basic tier with paid upgrades and a library of 260,000+ 3D models, used by both homeowners and professionals.
  • MY3DPLANNER turns a 2D sketch into 3D, has templates, cloud storage and multi-user editing.

Many of these apps only offer a trial. Before you draw the whole house, check the project limits, which export formats are allowed and what the free tier blocks. For styling and furniture rather than walls, see how people decorate a room online.

BIM programs such as Archicad and Revit sit at the other end. They keep plans, sections and schedules in sync from one model, which is why professionals use them for full building sets. Both have 30-day trials.

Free and low-cost desktop CAD when the browser is not enough

Desktop programs still beat web tools on automation depth, while web tools win on multi-user editing. If you need layers, blocks and accurate printing without a big bill, these are the usual choices.

QCAD

QCAD is one of the strongest free 2D programs. It has hierarchical layers, blocks, dimensioning, coordinate entry, precise snaps and reliable DWG/DXF exchange. It runs on Windows, macOS and Linux. The base is free; the Professional add-on adds DWG support and more tools for a one-time fee, with no subscription. It also has a property editor that shows the area of polylines and hatches, an offset tool, measuring tools, a 5,000+ symbol part library, ECMA scripting and isometric, dimetric, cabinet and cavalier projections. Version 27 adds XRef support, one-click hatching, gradients and an MCP interface for drawing from a text prompt. Collaboration is its weak side.

LibreCAD

LibreCAD is free and open source under GPLv2, with no trials, subscriptions or fees. It started from the QCad community edition (it was once called CADuntu). It runs on Windows, macOS and Linux in 30+ languages, with layers, dimension styles, block reuse and plugins. It imports DWG-family files and exports DXF, PNG, SVG and PDF. There is no 3D, no parametric modeling and no dynamic blocks. It suits building and room plans, interior layouts and diagrams. Support comes from the community forum, wiki and manual.

nanoCAD, DraftSight, BricsCAD and TurboCAD

nanoCAD's basic version is free but not for commercial use, runs only on Windows, and offers Excel-style table editing plus raster and point cloud editing. DraftSight, from Dassault Systemes, reads and writes DWG and DXF, exports PDF, JPEG, SVG and PNG, and offers layers, batch printing, macro recording and a LISP API; it also handles AutoCAD dynamic blocks. BricsCAD feels close to AutoCAD and opens its templates, blocks, sheets, LISP routines and dynamic blocks, runs on Windows, macOS and Linux and has 100+ third-party plug-ins. TurboCAD imports and exports DWG, DXF and PDF and includes rendering tools.

AutoCAD desktop

AutoCAD is command-based: you can drive it with typed commands, shortcuts and scripts. It comes in industry versions with architecture, electrical and mechanical toolsets. The learning curve is steep, but tutorials and documentation are everywhere. AutoCAD LT costs about 75% less and is enough when you do not need 3D.

Online drafting tool pricing and license limits

Prices in US dollars as of 2026. Vendors revise them often, so confirm the current price before you buy.

ToolFree optionPaid price (USD)
AutoCAD (incl. web app)30-day trial; free 1-year education licenseAbout 1,470 to 1,955 per year, or 245 per month
AutoCAD LTTrialAbout 75% less than full AutoCAD
BricsCADNone listedLite from 314, Pro 677, BIM 1,010, Ultimate 1,120 per year; perpetual license available
DraftSightNone listedStandard 99, Professional 199, Premium 499 per year (full 3D only in Premium)
TurboCADNone listedDesigner 69.99, Deluxe 229.99, Professional 699.99, Platinum 1,499.99; perpetual or subscription
nanoCADBasic version, non-commercial onlyFrom about 249 (Platform), 399 (Pro, Construction), 540 (Mechanica)
QCADFree baseProfessional add-on 39.92 one-time
LibreCADFully freeNone
SketchUpSketchUp Free in browser; 7-day trial of paid plansAbout 10.75 per month
Revit30-day trialAbout 290 per month
ZWCAD30-day trial899 one-time
OnshapeFree plan, data publicNot listed

Users regularly name the price, roughly USD 1,470 to 1,955 a year, and the steep learning curve as AutoCAD's main drawbacks.

Read the license, not just the price tag. nanoCAD's free version bans commercial use, Onshape's free plan makes your files public, and 3DTin's free work is published under Creative Commons. Students and educators can get a free one-year Autodesk education license, but that is for learning, not paid jobs.

File formats, scale printing and handing drawings over

DWG is the shared format for 2D drawings. If your plan will go to an architect, engineer or contractor, saving in DWG (or DXF as the exchange version) avoids most compatibility trouble. Consultants usually deliver DXF or DWG with the layers intact, so the next person can switch layers on and off instead of redrawing.

  • DWG / DXF: the working drawing. AutoCAD, BricsCAD, DraftSight, QCAD and TurboCAD read and write both; LibreCAD imports DWG-family files and saves DXF.
  • PDF: for review and printing. Most tools export it.
  • PNG, JPEG, SVG: images for quick sharing, not for further drafting.
  • SKP, STL, OBJ, DAE: 3D model formats from SketchUp, Tinkercad and 3DTin, useful for 3D printing or modeling, not for a 2D plan set.

Printing to scale matters as much as the file. QCAD prints to an exact scale and can split a large drawing across several sheets as a poster, which helps when you have no plotter. Whatever tool you use, check the printed scale with a ruler before anyone measures off the paper.

Templates and inserted blocks keep outlines, dimensions and callouts consistent from one sheet to the next. Set them up once and every new drawing starts with the same text heights, dimension style and layer names.

Limits of online CAD tools

Browser tools save installation time, cost little or nothing, and let remote teams and clients share and version drawings in real time. They also have real weak spots.

  • No advanced parametric modeling, batch processing or deep analysis of the kind desktop CAD offers.
  • Many are limited to viewing and light edits, with weaker layer management and clumsy editing of complex geometry.
  • No stable internet, no work. On a site with a poor signal this is a daily problem.
  • Drawings live in cloud storage, which raises data security and confidentiality questions on client projects.

In practice many people sketch and share in the browser, then move the drawing into a desktop program for the precise sheets and printing.

How to choose an online drafting tool

Start with what you need at the end, then work back to the tool.

  1. Output. A furnished home layout calls for a floor-plan app. A scaled drawing someone will build from calls for CAD with DWG or DXF export.
  2. 2D or 3D. If no render or model will ever be needed, a 2D tool is cheaper and faster.
  3. Collaboration. Several people editing at once favors a browser tool. Working alone with heavy automation favors desktop.
  4. Learning curve. Tinkercad and floor-plan apps need no CAD knowledge. AutoCAD and its clones take real time to learn, though tutorials are plentiful.
  5. Licence and budget. Check commercial-use rules, public-data plans and what a trial blocks before you invest hours.
  6. Hardware. A drawing tablet works for CAD, but a mouse places points and adjusts curves more accurately. Tablets earn their place for marking up drawings on site.

Software only draws what you tell it. If your plan is heading for a permit, a structural change or a contractor's price, the drawing set usually needs someone trained to prepare it, and in many places a licensed professional's signature. A remote architect can take your sketch or DXF file and turn it into a proper set, and our breakdown of how much an architect costs helps you compare that against learning CAD yourself.

Online drafting tool FAQ

Is there a free online drafting tool?

Yes. SketchUp Free, Tinkercad and Onshape's free plan run in a browser at no cost, with limits: SketchUp Free is 3D-first, and Onshape's free data is public. For free 2D drafting on your own computer, LibreCAD is fully free and QCAD has a free base version.

Which CAD software runs in a browser?

AutoCAD Web, Onshape, SketchUp Free, Tinkercad, ShareCAD, ARES Kudo and Vectary all run in a browser. AutoCAD Web is the closest to desktop drafting, with drawing, dimensioning, annotation and shared editing, and it comes with an AutoCAD subscription.

What is the advantage of 2D over 3D CAD?

2D software is far cheaper, carries only the essential functions and is quicker to learn. It is also usually faster for small projects and quick changes. Choose 3D when you will need renders or a model later.

Can I use a drawing tablet for CAD?

You can, but a mouse is better for placing points precisely and adjusting curves. A tablet is handy for annotating drawings on site.

Can I use a free CAD program for paid work?

It depends on the license. LibreCAD has no fees or usage limits under GPLv2, while nanoCAD's free version is non-commercial and the Autodesk education license is for students and educators only.

Planning a build, a renovation or a new interior?

Send a floor plan, photos or a short description. We will reply with what drawings you need and how the work can be organised remotely.

Discuss your project

Read next

Architectural 3D Modeling: Process, LOD and SoftwareHow architectural 3D modeling works, from massing to BIM and drawings, what LOD 100 to 500 mean, and which software fits, with 2025-2026 US prices.Decorate a Room Online: Planners, Bedroom Design and Online Architect HelpDecorate a room online step by step: measure, build a 3D model, place furniture, pick colors, and decide between a free planner and a paid online designer.Remote architect: what the job involves and how to get into itHow a remote architect works in the US: types of jobs, license rules, software, home office setup, finding clients, contracts, pay figures and limits.