Commercial drafting is the production of the drawing set a commercial building is permitted, priced and built from. The set covers architectural, structural, civil and MEP sheets, dimensioned and cross-referenced to schedules and specifications. A small set has a few dozen sheets, and a large one can pass 1,000.

Topic
Drawings
Updated
Reading time
11 min
Studio
Morales Arch & Design
Open commercial plan sheets on a plywood table at a building site
In this article
  1. What commercial drafting is
  2. Where commercial drafting fits in the project phases
  3. What a commercial drawing set contains
  4. Permit set vs construction set
  5. Code and permit requirements for commercial drawings
  6. Sheet numbering, sizes and CAD standards
  7. How drawings, schedules and specifications work together
  8. Who does commercial drafting and in what software
  9. Checking the drawing set before and after issue
  10. Commercial drafting FAQ

What commercial drafting is

Commercial drafting turns the design decisions of architects and engineers into technical drawings for commercial buildings and additions to them. Most of that work happens in the construction documents phase, where sheets have to be detailed enough for a contractor to price and for a building official to review.

Two terms get mixed up here. Construction drawings are the graphic part. Construction documents, or CDs, add written specifications and contract documents to those drawings.

CDs also have a narrow and a broad meaning. Narrowly, they are the drawing set plus the project manual issued when the phase ends. Broadly, the term stretches to the schedule, the estimate, addenda, requests for information (RFIs), change orders and record drawings. If a proposal says CDs are included, settle which meaning applies.

The general types of plans and views are covered in our guide to architectural drawings. A commercial set uses the same views and adds several engineering disciplines and a good deal of code data.

Where commercial drafting fits in the project phases

AIA B101-2017 splits architectural services into five phases: schematic design, design development, construction documents, bidding and construction administration. Drawings are produced from the first one, but their job changes at each step.

StageWhat the drawings show
Schematic design (SD)Massing, basic floor plans, elevations
Design development (DD)Systems, materials and major dimensions fixed; the 100% DD set often goes out for pricing
Construction documents (CD)Work dimensioned, specified and coordinated at a level a contractor can price
Permit setCode compliance for the building department
Bid setOften identical to the 100% CD set
For Construction setFinal dimensions, materials and methods for the build

The CD phase is the longest. Larger projects check the set at 50%, 75%, 95% and 100% completion, and on the biggest buildings coordination and review can run for years.

Modeling has moved hours forward. Designers now build wall assemblies and door families during design development, work that used to wait for CDs. A firm that still budgets the old way can see its CD hours blow out around month four, so the fee split has to follow the actual modeling effort.

What a commercial drawing set contains

The set is divided into series by discipline. Under the US National CAD Standard (NCS) the order is General, Civil, Landscape, Structural, Architectural, Plumbing, Mechanical, Electrical. Fire protection gets its own series as well.

  • General: cover sheet, sheet index, code summary, abbreviations and symbol legends.
  • Civil: grading, utilities and other work in the ground.
  • Structural: the elements that keep the building stable, including foundations and framing.
  • Architectural: floor plans, reflected ceiling plans, elevations, building and wall sections, enlarged plans, details, schedules.
  • MEP and fire protection: separate sheets for plumbing, mechanical, electrical and fire systems.

Plans

The site plan sets out the building footprint, access, parking, landscaping and the relation to neighboring properties. Floor plans show walls, doors, windows, stairs, fixtures, room sizes and room functions, with a separate plan for each level. The roof plan records slopes, ridges, valleys, vents and skylights.

Thick bound drawing sets hanging on plan room racks

A reflected ceiling plan (RCP) is drawn as if the ceiling were mirrored in the floor. It places light fixtures, HVAC elements and decorative items. The layout decisions behind it belong to commercial interior design.

Sections and elevations

Building sections and cross sections cut through the structure. Wall sections show the layers, including insulation, drywall and finishes, and detail sections enlarge one junction. Elevations come as exterior, interior, call-out and detail views.

Permit set vs construction set

A permit set is drawn for the authority having jurisdiction (AHJ). It shows code compliance and leaves out many details that only the builder needs. The construction set carries the dimensions, materials and methods required on site.

Under the International Building Code (IBC), the permit application goes in with two or more sets of construction documents. The approved set is stamped "Reviewed for Code Compliance". The building official keeps one copy and another stays on site.

You may permit from one set and bid from another. The limit is that the construction set cannot change anything the plans examiner relied on unless an amended set is submitted.

These documents follow the building to the end of the job. The certificate of occupancy records the permit number, along with the code edition, occupancy classification and construction type they established. The client cannot occupy the space before it is issued.

Legal weight of the drawings

Drawings are contract documents, a term defined in AIA A201 section 1.1.2, and contractors are bound to build what they show. They state design criteria and leave means and methods to the contractor. A sealed set carries the architect's professional responsibility.

Contract, permits and insurance are normally arranged in parallel, with permits issued locally by the city or county. Work cannot start before the permit and insurance are in place. Unclear sheets get read in different ways, and the result is rework, delay and extra cost.

Code and permit requirements for commercial drawings

Submittal requirements depend on the AHJ, so get the local list before laying out title sheets. The City of Tampa, Florida, gives a clear picture of what a plan reviewer wants to see for a commercial addition:

  • Site plan with location, dimensions and flood zone.
  • Survey showing trees and easements.
  • Building plans citing the current FBC (Florida Building Code), NFPA, FFPC and NEC editions, the construction type and the scope of work.
  • Scaled floor plan with room labels and dimensions.
  • Proposed occupancy and use, plus height and area calculations.
  • Life safety plan with egress.
  • Wind speed and pressure, and live and dead loads for roof and floors.
  • Foundation plan, framing plans and wall sections if required.
  • Florida product approvals and termite notes where applicable.
Exit corridor of a new commercial building with fire doors and emergency lights

Engineering trades are submitted on their own sheets. Mechanical plans list equipment, ducts and heating and cooling loads. Electrical plans carry load calculations, panel schedules and a riser diagram. Plumbing plans are separate, and energy calculations complete the package.

Before any submittal, compare the code summary with the governing code edition. Then check egress dimensions and accessibility clearances, confirm who has to sign and seal, and make sure the AHJ accepts your sheet size.

Sheet numbering, sizes and CAD standards

NCS identifies each sheet by a discipline letter, a one-digit sheet type and a two-digit sequence. A-101 is therefore the first architectural plan sheet. Sequence 00 is not permitted.

DigitSheet type
0General
1Plans
2Elevations
3Sections
4Large-scale views
5Details
6Schedules and diagrams
7-8User defined
93D views

Version 7 of the standard was published in September 2025. Module 1 of Version 6 lists 21 discipline designators, and the familiar labels (A, S, M, E, P, SP) help reviewers find their sheets. The order usually follows the spec book: zoomed-out views first, then from the bottom of the building up.

Leave gaps in the sequence. If the first-floor plan is A-110, its RCP can be A-115 and the second floor A-120 and A-125, so a late sheet slots in without renumbering. A revised sheet takes an R suffix, as in A-102-R1.

ARCH paper sizes in the US run as follows: A is 9 x 12 in, B 12 x 18 in, C 18 x 24 in, D 24 x 36 in and E 36 x 48 in. New York City prefers 24 x 36 in and caps sheets at 36 x 48 in.

How drawings, schedules and specifications work together

Drawings locate and size the work, while specifications describe its quality. A door shows how the chain runs. The plan gives its position and a type code, the schedule on a 6-series sheet gives size, material and rating, and Division 08 of the specs names the frame and hardware. Finish and coating requirements also sit in the spec book.

Door, window, hardware, finish and equipment schedules all rely on this chain. Break it between tag, schedule and spec, and the contractor writes an RFI. Keynotes must match the spec section numbers for the same reason.

Specifications follow CSI MasterFormat, whose 2026 edition is digital only. The main divisions on a commercial job:

  • 00-01: general
  • 03: concrete
  • 08: openings
  • 09: finishes
  • 22-26: mechanical, electrical and plumbing
  • 31-33: civil work

AIA A201-2017 treats drawings and specifications as complementary. A requirement found in one binds the contractor as if it appeared in both, so a stray note on a single sheet still counts.

Who does commercial drafting and in what software

A drafter converts the designs of architects and engineers into technical drawings. Architectural drafters may specialize in commercial work or in residential drafting, or by material: reinforced concrete, masonry, steel or timber. Civil and electrical drafters produce their own parts of a commercial set.

No licence is needed to work as a drafter. Training comes from technical schools and community colleges, with diplomas of two to three years, and the American Design Drafting Association offers certification. Sealing the set is a separate matter that follows the jurisdiction's rules.

AutoCAD and Revit are the usual tools, and knowledge of traditional drafting is still expected. Many firms produce the CD set in Revit and others stay in CAD. NCS sheet conventions apply to both. For model-based work, see what Revit drafting services include.

Contract drawings are still 2D. Many teams model in BIM and slice the model into 2D sections, which also gives them clash detection and walkthroughs.

Checking the drawing set before and after issue

The reviewer should be someone who did not draw the sheets. A simple arrangement is to trade sets with another project lead the day before issue. The check covers these points:

  1. Open items are resolved.
  2. The structural grid is overlaid on the architectural plans and matches.
  3. Each dimension appears once.
  4. Every tag and keynote leads somewhere.
  5. Schedules reconcile with the plans.
  6. Consultant sheets are cross-checked against the architectural set.
  7. Code summary, egress dimensions and accessibility clearances are verified.
  8. The sheet index lists every sheet, and title blocks are complete.
  9. Seals, signatures and sheet size suit the AHJ.

After the set goes out

RFIs clarify the documents without added cost. Change orders adjust the contract sum or the time. Submittals are handled during construction but are not contract documents. Record drawings are compiled from the contractor's markups.

Public sets to study

Before building your own set, study a real one that went out to bid. Shreveport Fire Station #15 has 62 plan pages and a 758-page project manual. The Bellefontaine storage building in Missouri is a compact 32 sheets. The University of Maine Russell Hall project covers an envelope upgrade.

Commercial drafting FAQ

What is commercial drafting?

It is the preparation of technical drawings for commercial buildings: plans, reflected ceiling plans, sections, elevations, details and schedules, coordinated with civil, structural and MEP sheets and with the specifications.

What is the difference between construction drawings and construction documents?

Construction drawings are the graphic sheets. Construction documents include those sheets plus written specifications and contract documents.

Do commercial drawings need an architect's seal?

Seal and signature rules are set by the jurisdiction, so confirm them with the local building department before submitting. A sealed set carries the architect's professional responsibility.

Can the permit set and the construction set differ?

Yes. The construction set normally carries more detail, but it cannot alter what the plans examiner relied on without an amended set.

What are as-builts?

As-builts, also called record drawings, are compiled from the contractor's markups made during construction.

Planning a build, a renovation or a new interior?

Send a floor plan, photos or a short description. We will reply with what drawings you need and how the work can be organised remotely.

Discuss your project

Read next

Architectural Drawings: Types, Drawing Sets and How to Read ThemWhat architectural drawings are, the main types from site plan to details, how a drawing set grows from concept to construction, and how to read scale and symbols.Commercial design interiors: process, code requirements and costsHow commercial interiors are designed and built: briefing, space planning, ADA and fire codes, finishes, 2024-2026 US costs, design fees and hiring checks.Revit Drafting Services: What You Get, How It Works and What It CostsWhat Revit drafting services cover, from plans, schedules and details to permit sets, plus file formats, workflow, US hourly rates and provider checks.