EN

Revit Drafting Services: What You Get, How It Works and What It Costs

Revit drafting services turn a building model into the 2D sheets people build from, mainly plans, sections, details and schedules, with permit and construction sets assembled from them. Architects, engineers, interior designers and contractors buy them by the hour, by the project or as a monthly drafter. Published US rates in 2026 start at about $25 an hour for Revit work, and the scope is set by project stage and required level of development.

Topic
Drawings
Updated
Reading time
11 min
Studio
Morales Arch & Design
Drafter working on a building model on two monitors in a small office
In this article
  1. What Revit drafting services are
  2. What is included, from schematic design to as-builts
  3. How drafting works inside Revit
  4. Types of Revit drafting by discipline
  5. Revit or AutoCAD drafting
  6. Why firms outsource Revit drafting and who uses it
  7. How the process works and what you receive
  8. What Revit drafting services cost
  9. How to choose a provider and avoid bad files
  10. Questions about Revit drafting outsourcing

What Revit drafting services are

Revit drafting is the 2D side of Revit: drafting views, detail views and construction documents produced from the building model. Modeling creates the building elements in three dimensions. Drafting makes that information readable on a sheet, with scale, dimensions, notes and symbols.

A contractor can't build from a bare 3D model. The crew needs floor plans and sections, and above all details that show how parts meet, such as how a window sits in its wall or how waterproofing is carried over a roof edge.

Carpenter looking at a drawing sheet beside a framed window opening

The work is done by Revit drafters and BIM modelers, usually with a Revit specialist who maintains templates and views. A project manager coordinates them, and interior designers or structural and MEP engineers join where the discipline calls for it. The output is both 2D plans and the 3D model behind them, prepared to local building codes. If you are still comparing formats, the broader range of architectural drafting services includes CAD work as well.

What is included, from schematic design to as-builts

A typical order is a sheet set extracted from the model and dressed in the client's own title block, view templates, keynote files, annotation families and sheet naming. The usual contents are:

  • floor plans, enlarged plans and roof plans;
  • reflected ceiling plans (RCPs), elevations and building sections;
  • wall sections, stair and elevator sections, construction details;
  • room, door and window, finish, wall type and equipment schedules;
  • general notes, legends, sheet setup and permit sets;
  • redline incorporation, as-built updates and custom families.

Schedules are worth a separate mention. When they are built inside Revit they stay tied to the elements, so a changed door type updates the door schedule without retyping.

Scope is easiest to agree by stage, because each one needs a different amount of detail:

StageWhat the drafter produces
Schematic design (SD)Layouts, massing, site plan, area schedules
Design development (DD)Refined drawings, wall types, assembly details, schedules, coordination
Construction documents (CD)Permit-issue sets, detail sheets, keynote legends, links to specifications
PermitThe permit-ready drawing set
As-builtDrawings updated after changes on site

The level of development (LOD) should be fixed before drafting starts, because it decides how much detail the model and the sheets have to carry. For a fuller look at what each sheet type communicates, see the guide to architectural drawings.

How drafting works inside Revit

There are two ways to draft in Revit. Plans, sections, elevations and callouts are linked to the model and follow it when it changes. A drafting view is a 2D canvas with no connection to the model: it is drawn by hand and stays as drawn.

Detail view (callout or section)Drafting view
Link to the modelLinked, updates with itStandalone, does not update
Best forConditions specific to this project, such as a roof-to-wall junctionTypical details repeated between jobs, such as a standard wall section or window flashing
ReuseTied to the projectCan be inserted into other projects

The drafter's 2D toolkit is fairly compact. Detail lines do the linework, and filled regions supply hatches for concrete, insulation or soil. Detail components are ready-made items such as bolts, anchors, wall ties and insulation batts. Text notes with leaders, dimensions and keynotes finish the view. A keynote tags an element with a pre-written description, for example "Wall Type B", which keeps notes short and worded the same on every sheet.

Building a detail

  1. Start from a callout or section and set a larger scale, for example 1 1/2" = 1'-0".
  2. Switch the detail level to Fine.
  3. Add detail components and repeating details.
  4. Draw insulation and masking regions, then flashing and sealant lines.
  5. Add notes, keynotes and dimensions, and place the view on a sheet.

Creating and reusing a drafting view

Go to View > Create > Drafting View, give it a name, choose the scale, draw, and drag it onto a sheet. To bring in views from another job, use Insert > Insert from File > Insert Views from File. Over a few projects this becomes an office detail library, and typical details no longer have to be redrawn.

Types of Revit drafting by discipline

Most orders fall under one of the headings below, and a large project may need several at once.

  • Architectural. Plans, RCPs, elevations, wall, stair and elevator sections, and details through SD, DD and CD to permit-issue standard.
  • Structural. Framing and foundation plans, sections, beam and column schedules, connection details, slab openings and rebar.
  • MEP and fire protection. HVAC, plumbing, electrical and fire protection plans with tags and legends, risers, equipment schedules.
  • Interior and FF&E. Room layouts, floor covering plans, RCPs, lighting, electrical and plumbing layouts, wall elevations, finish schedules, and drawings for furniture, fixtures and equipment.
  • Shop and fabrication. Drawings taken from 3D models for contractors and subcontractors, plus millwork and furniture sheets.

Two support tasks often come with these. The first is conversion: legacy CAD files, PDFs, scans and hand sketches are rebuilt in Revit or digitized to CAD, and 3D files can be turned into 2D drawings. The second is family creation. Standard libraries don't have everything, so unusual or technically complex elements need a custom Revit family, and product manufacturers order families of their own range.

Revit or AutoCAD drafting

Revit earns its place when many drawings depend on the same information. Views update with the model, tags and dimensions read live data, standard details can be reused and the set stays consistent. Fewer coordination errors at drawing stage should also mean less rework during construction.

Choose Revit forChoose AutoCAD for
BIM workflows and 3D models2D drafting and quick drawing production
Coordinated documentationConstruction details
Larger projectsRenovation drawings and legacy files
Workstation with a 3D model on one screen and a 2D plan on the other

Plenty of firms buy both. AutoCAD orders tend to be floor plans, elevations, sections, existing-condition drawings, conversions and detail drafting, while the Revit side covers model development, coordinated sheets and families. For the software question on its own, compare the options by drafting program.

Why firms outsource Revit drafting and who uses it

The common trigger is a backlog. Drawing production piles up, revisions keep arriving and the deadline does not move. Hiring an experienced drafter is slow, and some offices are busy enough for a third one without the steady workload to justify the position. Outside drafters supply that capacity without hiring and training overhead.

Control stays in house. External drafters can work inside the client's BIM file with the client's families, templates, naming standards and sheet layouts, while project management and design decisions remain with the firm. Drafting straight from an existing 3D model also removes redrawing, which can cut the time for that step by up to 70%.

Who orders it, and for what:

  • architecture firms and residential or commercial architects, for construction sets, DD support and redlines;
  • MEP consultants and structural engineers, for discipline sheets;
  • contractors and subs, for shop drawing submittals and as-built plans from measurements;
  • interior studios, for room layouts, finish schedules and RCPs;
  • design-build firms, millwork and cabinet shops, furniture manufacturers;
  • developers, who also use 3D color floor plans to pre-sell units.

Project size varies widely. Revit sets are produced for a 12-unit, 18,000 sq ft residential building, a five-story hotel of 150,000 sq ft, a school of 321,500 sq ft or a healthcare building of 502,000 sq ft. Data centers, industrial buildings and apartments are regular work too, and much of it overlaps with commercial drafting. Providers commonly serve clients anywhere in the US remotely.

How the process works and what you receive

  1. Send inputs. Sketches, CAD files, PDFs, markups or an existing Revit model, along with sample sheets and your standards.
  2. Agree scope. Sheets, LOD, Revit version, templates and delivery format. An NDA is commonly signed for the project.
  3. Test a sample. A sheet on your own title block shows quality before you commit to the full set.
  4. Draft and check. Templates are set up, sheets are produced, and QA covers annotations, dimensions and detailing.
  5. Review and revise. Comments travel through Slack, Teams or similar, with marked-up screenshots for coordination issues.
  6. Deliver in the agreed formats, with redlines picked up.

On timing, a quote may come back within 24 hours, or in 2–3 business days when it includes a drafting plan. A sample sheet takes 2–3 business days as well. During the job, previews usually appear in 1–2 business days depending on stage. Teams spread across time zones can keep production going almost around the clock.

Ask for these files at handover:

  • RVT with the sheets set up;
  • PDF, one per sheet and a combined file;
  • DWG per sheet;
  • XLSX schedules;
  • IFC for coordination and BIM 360 upload.

Documentation can follow the project's BIM execution plan (BEP) and AIA standards, so name them with the brief.

What Revit drafting services cost

Published US rates in 2026 start at about $20 an hour for CAD drafting and $25 an hour for Revit or BIM work, with the first two revision rounds free at that level. These are entry-level rates for outsourced production. Pricing is commonly tiered, from a quick schematic draft at the bottom to full construction documents at the top.

There are several ways to pay:

  • by the hour;
  • a price per project, based on the agreed scope;
  • a full-time senior drafter paid per month;
  • a retainer for an ongoing workload.

Regular clients and large tasks often get a discount. When comparing quotes, check the number of free revision rounds, the LOD and whether custom families or conversion of old files are counted separately.

How to choose a provider and avoid bad files

Two problems are worth screening for: files that need hours of cleanup after delivery, and 2D linework redrawn on top of the model where the views should have been driven by it. The sample sheet is the place to catch both. Open the RVT, change an element and see whether the plan, section and schedule follow.

Before signing, confirm the following:

  • The drafters understand LOD, view templates and sheet setup, and will follow your company standards.
  • They work in the Revit version you specify and are comfortable with Navisworks and AutoCAD.
  • QA/QC on annotations, dimensions and detailing is a defined step.
  • An unclear dimension is flagged as a question on the sheet instead of being guessed.
  • An NDA is signed. For data security, ISO/IEC 27001:2022 certification is a useful thing to ask about.

Continuity matters as much as skill. With the same drafters and one project manager on every job, your title blocks, layer standards and preferences stay on file and later projects go faster. A team that changes with each order has to learn them again.

Put the sheet list, LOD, Revit version and file formats in writing with the quote.

Questions about Revit drafting outsourcing

What is Revit outsourcing?

It means giving part of the Revit production to an outside team: model development, drafting and documentation, permit drawing help, construction sets, as-built modeling, families or redline corrections. Your office keeps project management and design control.

Can an outsourced team follow our company standards?

Yes, if you supply them. Send the template, title block, keynote file, families, naming rules and a sample sheet. The team then works within your file and returns sheets that match.

Is Revit better than AutoCAD for architecture?

For larger buildings and coordinated documentation, generally yes, because views and schedules update together. AutoCAD is still practical for 2D details, renovation drawings and legacy files.

Can we outsource Revit and AutoCAD work together?

Yes. Many teams handle both, including conversion of CAD, PDF and scanned drawings to Revit, and they export DWG from the finished Revit sheets.

What is a drafting view in Revit?

A standalone 2D view that isn't tied to the model. It is used for typical details that repeat from project to project, and it does not update when the model changes.

Which formats will I get?

Usually RVT with sheets, PDF per sheet and combined, and DWG per sheet. Schedules come as XLSX, and IFC is supplied for coordination.

Planning a build, a renovation or a new interior?

Send a floor plan, photos or a short description. We will reply with what drawings you need and how the work can be organised remotely.

Discuss your project

Read next

Architectural drafting services: what you get, from sketch to permit setWhat architectural drafting services include in the USA: drawing types, as-builts, CAD and Revit, permit sets, stamps, turnaround and provider choice.Architectural Drawings: Types, Drawing Sets and How to Read ThemWhat architectural drawings are, the main types from site plan to details, how a drawing set grows from concept to construction, and how to read scale and symbols.Drafting program: which CAD software to choose, free or paidWhich drafting program fits your work: AutoCAD, ArchiCAD, SketchUp, LibreCAD, QCAD and FreeCAD, with US prices, free limits and file formats.