EN

Architectural design and drafting

I design houses, extensions, renovations and small commercial buildings and prepare the drawing set that takes them from an idea to construction.

Every project starts with the layout: how the rooms connect, where light comes from, how the building sits on the site. Once the layout is agreed, I develop it into a coordinated set of drawings in AutoCAD, so the builder, the engineers and the permit office all read the same information.

If you already have a design and only need it drawn properly, I can work from your sketches, an older set of plans or measurements of an existing building.

What is included

  • Schematic design and floor plan options
  • Floor plans with dimensions
  • Elevations and sections
  • Construction details
  • Site development plan
  • As-built drawings of an existing building
  • Area and building efficiency calculations

Questions

Can you prepare drawings for a building permit in my country?

I prepare the drawings and documentation; a locally licensed architect or engineer reviews, signs and submits them. I do not promise permit approval, because it depends on the local authority.

Can you work from a hand sketch?

Yes. A sketch with the main dimensions and a few photos is enough to start a measured drawing.

Do you also design the structure?

No. Structural design belongs to a structural engineer. I coordinate the architectural drawings with the engineer's drawings.

Services

All services

Planning a build, a renovation or a new interior?

Send a floor plan, photos or a short description. We will reply with what drawings you need and how the work can be organised remotely.

Discuss your project