Interior design and fit-out drawings
An interior that looks good in a render and can also be built: layouts, elevations, ceiling plans and joinery drawings for homes and commercial spaces.
I start from the way the space will be used: furniture layout, storage, circulation, lighting. Then the interior is drawn in detail, wall by wall, so the contractor knows exactly what goes where.
For shops and kiosks I pay special attention to display, counters and storage, which are built by joiners and need precise shop drawings.
What is included
- Furniture and space layout
- Interior elevations
- Reflected ceiling and lighting plans
- Finishes and materials schedule
- Joinery and built-in furniture drawings
- 3D model and renders of key views
Questions
Do you choose and buy furniture?
I specify the furniture and finishes in the drawings and schedules. Purchasing and site work stay with you and your contractor.
Can you design a single room?
Yes. A kitchen, a bathroom or one shop unit is a normal project size.
Will I see the interior before it is built?
Yes. I build a SketchUp model and can render the main views in Lumion.
Services
All servicesPlanning a build, a renovation or a new interior?
Send a floor plan, photos or a short description. We will reply with what drawings you need and how the work can be organised remotely.