Plumbing and drainage design
As a registered master plumber, I design water supply, drainage and sanitary systems for houses, apartments and small commercial buildings.
Plumbing is easiest to get right on paper. I lay out fixtures, pipe routes, slopes and vents together with the architectural plans, so walls, floors and ceilings leave room for them.
My registration is in the Philippines. For projects elsewhere, the drawings are checked against local codes and signed off by a local professional where the authority requires it.
What is included
- Water supply layouts
- Drainage and sanitary layouts
- Riser diagrams
- Fixture schedules
- Bathroom and kitchen plumbing plans
- Coordination with the architectural drawings
Questions
Do you design electrical or HVAC systems too?
No. Those belong to electrical and mechanical engineers; I coordinate with their drawings.
Can you plan a single bathroom?
Yes. A bathroom or kitchen layout is a common small project.
Will the drawings be accepted abroad?
They are prepared to be reviewed by a local professional, who confirms them against local codes.
Services
All servicesPlanning a build, a renovation or a new interior?
Send a floor plan, photos or a short description. We will reply with what drawings you need and how the work can be organised remotely.