Shop drawings and furniture details
Shop drawings are where a design becomes something a workshop can make. I draw casework, millwork, cabinets, counters and facade systems for fabrication and installation.
Shop drawings were the core of my studio work: kitchen and storage cabinets, display counters with recessed storage, alcoves with LED lighting, and aluminium composite facades on steel framing.
Each drawing shows dimensions, materials, joints, hardware and installation details, and is checked against the architectural drawings and the site conditions.
What is included
- Kitchen cabinets and wardrobes
- Built-in furniture and counters
- Display units for shops and kiosks
- Facade cladding and framing details
- Sections and details at 1:5 to 1:30
- Revisions after RFI responses and redlines
Questions
Can you work from the designer's drawings?
Yes. That is the usual case: I translate the design intent into drawings for the workshop.
Do you take site measurements?
I work remotely, so the measurements come from you, your contractor or the existing drawings.
What scale are the details?
Usually 1:5 to 1:30, depending on the item.
Services
All servicesPlanning a build, a renovation or a new interior?
Send a floor plan, photos or a short description. We will reply with what drawings you need and how the work can be organised remotely.