EN

SketchUp modeling and 3D visualisation

A 3D model shows a space before anything is built. I model buildings, facades, interiors and built-in furniture in SketchUp and render them in Lumion.

The model is built from your plans, so it stays true to the real dimensions. It helps to compare options, to agree on materials and to show the design to a client, a partner or a bank.

The same model can then become a set of 2D drawings, so you do not pay twice for the same geometry.

What is included

  • SketchUp model from your plans or sketches
  • Exterior and interior views
  • Lumion renders of key views
  • Material and lighting studies
  • Models of casework and built-in furniture

Questions

What do I need to send to start a model?

A floor plan or a sketch with dimensions, photos of the site and examples of the look you want.

Can you model from a PDF plan?

Yes. A scaled PDF is a good starting point.

Do you make BIM or Revit models?

No. I work in SketchUp for 3D and AutoCAD for drawings.

Services

All services

Planning a build, a renovation or a new interior?

Send a floor plan, photos or a short description. We will reply with what drawings you need and how the work can be organised remotely.

Discuss your project